PSERC · Punjab State Electricity Regulatory Commission
Relaxation in certain provisions of the Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Resources Regulations, 2019 — Order
Relaxation in certain provisions of the PSERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Resources) Regulations, 2019
OrderDated 23 Sep 2019
Made under the Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources Regulations, 2019.
Summary
Summary written by software. Check the regulator's original before you rely on it.
PSERC issued this two-page order on 23 September 2019 to ease the introduction of its 2019 Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Resources Regulations (p1). The recitals explain the difficulty: SLDC submitted the Detailed Procedure required by Regulation 5.8 almost five months late, the draft needed rework before it could be approved, and the AMR-based metering needed for weekly energy accounting depends on the Government of India's SAMAST scheme, whose approval and funding are still pending (p1).
Exercising its relaxation powers under Regulations 11 and 12, the Commission makes three changes (p2): it extends SLDC's deadline for submitting the Detailed Procedure; it defers the coming into force of forecasting and scheduling obligations — otherwise due within six months of notification — to a fixed future date; and it defers weekly energy accounting and deviation settlement until the AMR system is operational at SLDC, allowing field officers to download interface data for monthly energy accounts and deviation settlement in the meantime.
Read with the parent Regulations, the practical effect is that solar and wind generators get a longer runway before the forecasting/scheduling regime and its deviation consequences bite, and that the initial regime runs on monthly rather than weekly accounting. The order is signed by two Members and the Chairperson (p2).
Read with this
The regulation
Commencement notices and reasons
Procedures and orders made under it
- Dated 24 Sep 2019Approval Letter — Detailed Procedure for Forecasting, Scheduling and Deviation Settlement of Solar and Wind Generation, 2019
- Dated 11 Feb 2020Forecasting, Scheduling and Deviation Settlement for Solar and Wind Regulations, 2019 — Relaxation Order, 2020
- Dated 24 Mar 2022Relaxation of Regulation 1.3, Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Resources Regulations, 2019 — extension of forecasting and scheduling to 30.09.2022
- Date not statedSolar & Wind Forecasting, Scheduling and Deviation Settlement Procedure, 2019
Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.