Skip to content

PSERC · Punjab State Electricity Regulatory Commission

Relaxation in certain provisions of the Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Resources Regulations, 2019 — Order

Relaxation in certain provisions of the PSERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Resources) Regulations, 2019

OrderDated 23 Sep 2019

Made under the Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources Regulations, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

PSERC issued this two-page order on 23 September 2019 to ease the introduction of its 2019 Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Resources Regulations (p1). The recitals explain the difficulty: SLDC submitted the Detailed Procedure required by Regulation 5.8 almost five months late, the draft needed rework before it could be approved, and the AMR-based metering needed for weekly energy accounting depends on the Government of India's SAMAST scheme, whose approval and funding are still pending (p1).

Exercising its relaxation powers under Regulations 11 and 12, the Commission makes three changes (p2): it extends SLDC's deadline for submitting the Detailed Procedure; it defers the coming into force of forecasting and scheduling obligations — otherwise due within six months of notification — to a fixed future date; and it defers weekly energy accounting and deviation settlement until the AMR system is operational at SLDC, allowing field officers to download interface data for monthly energy accounts and deviation settlement in the meantime.

Read with the parent Regulations, the practical effect is that solar and wind generators get a longer runway before the forecasting/scheduling regime and its deviation consequences bite, and that the initial regime runs on monthly rather than weekly accounting. The order is signed by two Members and the Chairperson (p2).

Standard name
Forecasting, Scheduling and DSM for Wind and Solar
Primary topics
Scheduling and despatch, Deviation settlement (DSM), Energy accounting and settlement

Read with this

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document