PSERC · Punjab State Electricity Regulatory Commission
Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources Regulations, 2019
Punjab State Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019
RegulationDated 7 Jan 2019Published in the Gazette 7 Jan 2019No.PSERC/Secy/Regu.135.- dated 7th January, 2019
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Punjab State Electricity Regulatory Commission issued these regulations on 7 January 2019 to bring wind and solar generators into the state's scheduling and deviation-settlement discipline (p1). Commencement is staged: the Regulations take effect from the Gazette notification, but the forecasting and scheduling provisions bite six months later and the commercial deviation-settlement mechanism only from a date the Commission is to notify separately (p1).
They apply to wind and solar generators of 5 MW and above connected to the state transmission or distribution system, and to generators of any capacity connected through pooling stations whose combined capacity is 5 MW and above, whether selling to a distribution licensee, to third parties through open access, or for captive use within or outside the State (p3). Existing and new generators are separated by whether they were commissioned before or after notification (p2).
Chapter 4 requires every pooling station to nominate a single Qualified Coordinating Agency, which becomes the registered single point of contact with SLDC and handles scheduling, metering and data coordination, payment of deviation charges into the State Pool Account and de-pooling back to individual generators (p3–4). Chapter 5, the Forecasting and Scheduling Code, allocates forecasting responsibility between generators/QCAs and SLDC, prescribes day-ahead and week-ahead schedule formats and the fifteen-minute time-block revision regime, and lists what the SLDC's Detailed Procedure must cover — QCA registration, data formats, communication protocol, energy-accounting guidelines, compliance monitoring and QCA default (p4–5). Gaming is treated as intentional mis-declaration of capacity or schedule (p5).
Chapters 6 and 8 carry the money: deviation charges for intra-state sale are banded by absolute error (Table I, p5–6); inter-state transactions follow the CERC deviation-settlement approach with a fixed rate linked to PPA rates or national APPC (p6, p9–10); SLDC computes and allocates state-level deviation charges and settles with QCAs on prescribed timelines, with interest for late payment and an end-of-year true-up from PSDF/NCEF (p7–8). Chapter 7 sets metering, telemetry and communication requirements; Chapter 9 requires obedience to SLDC curtailment instructions, with no deviation charges if curtailment is not communicated. Chapters 10–12 give the Commission practice-direction, relaxation and difficulty-removal powers.
Read with this
Commencement notices and reasons
Procedures and orders made under it
- Dated 23 Sep 2019Relaxation in certain provisions of the Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Resources Regulations, 2019 — Order
- Dated 24 Sep 2019Approval Letter — Detailed Procedure for Forecasting, Scheduling and Deviation Settlement of Solar and Wind Generation, 2019
- Dated 11 Feb 2020Forecasting, Scheduling and Deviation Settlement for Solar and Wind Regulations, 2019 — Relaxation Order, 2020
- Dated 24 Mar 2022Relaxation of Regulation 1.3, Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Resources Regulations, 2019 — extension of forecasting and scheduling to 30.09.2022
- Date not statedSolar & Wind Forecasting, Scheduling and Deviation Settlement Procedure, 2019
Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of PSERC's website on 26 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.