PSERC · Punjab State Electricity Regulatory Commission

Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources Regulations, 2019

Punjab State Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019

RegulationDated 7 Jan 2019Published in the Gazette 7 Jan 2019No.PSERC/Secy/Regu.135.- dated 7th January, 2019

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Punjab State Electricity Regulatory Commission issued these regulations on 7 January 2019 to bring wind and solar generators into the state's scheduling and deviation-settlement discipline (p1). Commencement is staged: the Regulations take effect from the Gazette notification, but the forecasting and scheduling provisions bite six months later and the commercial deviation-settlement mechanism only from a date the Commission is to notify separately (p1).

They apply to wind and solar generators of 5 MW and above connected to the state transmission or distribution system, and to generators of any capacity connected through pooling stations whose combined capacity is 5 MW and above, whether selling to a distribution licensee, to third parties through open access, or for captive use within or outside the State (p3). Existing and new generators are separated by whether they were commissioned before or after notification (p2).

Chapter 4 requires every pooling station to nominate a single Qualified Coordinating Agency, which becomes the registered single point of contact with SLDC and handles scheduling, metering and data coordination, payment of deviation charges into the State Pool Account and de-pooling back to individual generators (p3–4). Chapter 5, the Forecasting and Scheduling Code, allocates forecasting responsibility between generators/QCAs and SLDC, prescribes day-ahead and week-ahead schedule formats and the fifteen-minute time-block revision regime, and lists what the SLDC's Detailed Procedure must cover — QCA registration, data formats, communication protocol, energy-accounting guidelines, compliance monitoring and QCA default (p4–5). Gaming is treated as intentional mis-declaration of capacity or schedule (p5).

Chapters 6 and 8 carry the money: deviation charges for intra-state sale are banded by absolute error (Table I, p5–6); inter-state transactions follow the CERC deviation-settlement approach with a fixed rate linked to PPA rates or national APPC (p6, p9–10); SLDC computes and allocates state-level deviation charges and settles with QCAs on prescribed timelines, with interest for late payment and an end-of-year true-up from PSDF/NCEF (p7–8). Chapter 7 sets metering, telemetry and communication requirements; Chapter 9 requires obedience to SLDC curtailment instructions, with no deviation charges if curtailment is not communicated. Chapters 10–12 give the Commission practice-direction, relaxation and difficulty-removal powers.

Standard name
Forecasting, Scheduling and DSM for Wind and Solar
Primary topics
Scheduling and despatch, Deviation settlement (DSM), Energy accounting and settlement

Read with this

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of PSERC's website on 26 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document