Solar & Wind Forecasting, Scheduling and Deviation Settlement Procedure, 2019

Procedure For Forecasting, Scheduling and Deviation Settlement of Solar & Wind Generation

ProcedureDate not stated

Made under the Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources Regulations, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software, from pages 1 to 33 of 55. Check the regulator's original before you rely on it.

This is the SLDC/PSTCL detailed procedure approved by PSERC to implement the PSERC RE Forecasting, Scheduling, Deviation Settlement and Related Matters Regulations, 2019 (p1–2). The supplied pages 1–33 cover the operative procedure up to general provisions.

It begins with definitions and applicability (p2–4): it binds wind and solar generators of 5 MW and above connected to the state transmission/distribution system, or generators of any capacity connected through a pooling station of 5 MW and above, including those selling to distribution companies, third parties through open access or for captive use (p4). Roles are then allocated. Stand-alone generators must appoint a scheduling officer, run a 24x7 control centre, declare AvC, provide static and real-time data, maintain forecasting tools, submit day-ahead/week-ahead schedules and settle deviations (p5–7). Pool generators must appoint a QCA, which becomes the single point of contact with SLDC for schedules, metering coordination, commercial settlement and de-pooling; QCA qualification criteria cover forecasting experience, staff, net worth and authorisation from pool members (p7–9). SLDC is to develop a web-based SAMAST scheduling platform, maintain accounts, issue energy/DSM statements and operate the DSM pool account; until it is ready, fax/e-mail and manual meter reading apply (p10–11, p13–14, p21–22, p29–30).

Registration and de-registration are detailed for stand-alone generators and QCAs, including application proformas, processing fees, documents, bank guarantee and timelines (p11–15). The procedure then sets data communication protocol (p15–16), AvC declaration rules (p16), and the forecasting/scheduling process: day-ahead and week-ahead schedules in 96 blocks, revisions, SLDC curtailment, must-run treatment, gaming prohibition and default scheduling (p16–21). Metering requirements cover ABT interface/check/standby meters, AMR, SAMAST funding and defect handling (p21–22).

The core accounting part (p23–30) specifies monthly State Energy Accounts, weekly DSM once AMR is operational, and separate methodologies for intra-state and inter-state transactions. It gives formulae and illustrative tables for absolute-error bands, deviation charges, and the D4–R1 state-periphery impact, with refunds from PSDF/NCEF if positive. Payment mechanism, default consequences, fees, losses, dispute redressal before the CMC and review/general provisions follow (p30–33). The procedure states that existing generators must comply with forecasting/scheduling from 01.01.2020; AMR is expected within one year of PSDF funding; and after RE DSM software go-live there is at least an 8-week trial before commercial settlement begins on a date decided by the Commission (p17, p21, p33).

Standard name
Forecasting, Scheduling and DSM for Wind and Solar
Primary topics
Scheduling and despatch, Deviation settlement (DSM), Energy accounting and settlement

Read with this

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document