WBERC · West Bengal Electricity Regulatory Commission
Terms and Conditions of Tariff Regulations, 2026
West Bengal Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2026
RegulationDated 13 Jul 2026In force from 1 Aug 2026No. 82/WBERC dated 13th July, 2026
Summary
Summary written by software, from pages 1 to 39 of 298. Check the regulator's original before you rely on it.
The notification issues the WBERC (Terms and Conditions of Tariff) Regulations, 2026, made by the West Bengal Electricity Regulatory Commission and stated to supersede the 2011 tariff notification (p1). It extends to West Bengal and comes into force from 01.08.2026 (p1). Regulations 1.4–1.6 make it applicable to existing and future generating companies, transmission licensees and distribution licensees for Aggregate Revenue Requirement, tariff, mid-term review, truing-up and related matters, including generating companies with integrated coal/lignite mines supplying specified end-use stations; it excludes generating stations of transmission licensees whose tariff was competitively bid and adopted under s.63, and renewable/cogeneration stations covered by the 2013 RE/cogen regulations (p1–2).
Chapter 1 (pp1–30) also contains an extensive A–Z definitions clause covering accounting statements, ARR, availability, auxiliary consumption, change in law, control period, COD, integrated mines, open access, useful life and other tariff vocabulary. Regulation 3 (pp28–30) defines the Commission’s scope for tariff determination under s.62, intra-state transmission, wheeling, retail supply, intervening transmission facilities and inter-state supply under s.64(5), provides for adoption of s.63 tariffs, and limits compensation for losses from sales not covered by these regulations.
Chapter 2 (pp31–39) sets the Multi-Year Tariff framework: a five-year control period, MYT petition contents and filing ahead of the control period, annual truing-up petitions, distribution-licensee mid-term review, Commission-stipulated trajectories for loss and reliability variables, and treatment of controllable and uncontrollable gains or losses by reference to later regulations 9–11.
Read with this
Commencement notices and reasons
Other copies of these documents (1)
- Dated 13 Jul 2026Terms and Conditions of Tariff Regulations, 2026
Earlier drafts
- Dated 13 Nov 2025Terms and Conditions of Tariff Regulations, 2025 — Draft
3 more documents belong here and are not on Voltaic: 1 draft or notice on a draft, 1 draft or notice on a draft not held as English text and 1 procedure or order made under it not held as English text.
Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of WBERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.