Skip to content

WBERC · West Bengal Electricity Regulatory Commission

Terms and Conditions of Tariff Regulations, 2026

West Bengal Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2026

Regulation · Gazette copyDated 13 Jul 2026Published in the Gazette 13 Jul 2026In force from 1 Aug 2026No. 82/WBERC dated Kolkata, the 13th July, 2026

The Gazette copy of the Terms and Conditions of Tariff Regulations, 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software, from pages 1 to 19 of 171. Check the regulator's original before you rely on it.

The West Bengal Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2026 are the Commission's principal tariff regulation, notified as No. 82/WBERC in the Kolkata Gazette Extraordinary of 13 July 2026 (p1). They supersede the 2011 tariff notification and all its amendments (p1), and come into force on 1 August 2026 — a forward-dated commencement (p1). They extend to the whole of West Bengal and bind all existing and future generating companies, transmission licensees and distribution licensees for determination of Aggregate Revenue Requirement, tariff, mid-term review and truing-up (p1). They additionally apply to generating companies that draw coal or lignite from integrated mines allocated to them (p1). Two categories are carved out: transmission licensees' generating stations whose tariff was competitively bid and adopted under section 63, and renewable/cogeneration stations governed by the 2013 RE regulations (p2).

Chapter 1 (pp1–16) is preliminary: short title, extent, applicability, commencement and the two exclusions (pp1–2), followed by an extensive definitions clause (regulation 2) that supplies the tariff vocabulary used throughout — ARR, availability under Availability Based Tariff with the thermal and transmission formulae, auxiliary consumption including emission-control auxiliary consumption, control period, cut-off date, integrated mine and its mining-plan-linked annual target quantity, the capital-expenditure scheme categories, asset-wise useful life (p15), and the short-, medium- and long-term procurement duration bands (pp10–11, 13).

Chapter 2 (pp17–19) sets the general principles: a Multi-Year Tariff framework built on a five-year control period (p17); the filing calendar, with the MYT petition due well before the control period starts, annual true-up filings by 30 November, and for distribution licensees annual tariff determination within the control period plus a mid-term review filed in the third year (pp17–18); the treatment of controllable and uncontrollable factors through later regulations 10 and 11 (p17); the required contents of the MYT petition and its supporting documents (pp18–19); and the Commission's power to stipulate trajectories for losses, reliability indices, AT&C loss and collection efficiency (p19).

The pages cross-refer to Chapters 4 to 7 and Chapter 9, and to Schedules 1, 2, 3 and 7 and Annexure V (pp7, 14, 16, 18, 19).

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, ARR and true-up

Read with this

The regulation

Commencement notices and reasons

Earlier drafts

3 more documents belong here and are not on Voltaic: 1 draft or notice on a draft, 1 draft or notice on a draft not held as English text and 1 procedure or order made under it not held as English text.

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on wberc.gov.in ↗

Report an issue with this document