WBERC · West Bengal Electricity Regulatory Commission
Terms and Conditions of Tariff Regulations, 2026
West Bengal Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2026
Regulation · Gazette copyDated 13 Jul 2026Published in the Gazette 13 Jul 2026In force from 1 Aug 2026No. 82/WBERC dated Kolkata, the 13th July, 2026
The Gazette copy of the Terms and Conditions of Tariff Regulations, 2026.
Summary
Summary written by software, from pages 1 to 19 of 171. Check the regulator's original before you rely on it.
The West Bengal Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2026 are the Commission's principal tariff regulation, notified as No. 82/WBERC in the Kolkata Gazette Extraordinary of 13 July 2026 (p1). They supersede the 2011 tariff notification and all its amendments (p1), and come into force on 1 August 2026 — a forward-dated commencement (p1). They extend to the whole of West Bengal and bind all existing and future generating companies, transmission licensees and distribution licensees for determination of Aggregate Revenue Requirement, tariff, mid-term review and truing-up (p1). They additionally apply to generating companies that draw coal or lignite from integrated mines allocated to them (p1). Two categories are carved out: transmission licensees' generating stations whose tariff was competitively bid and adopted under section 63, and renewable/cogeneration stations governed by the 2013 RE regulations (p2).
Chapter 1 (pp1–16) is preliminary: short title, extent, applicability, commencement and the two exclusions (pp1–2), followed by an extensive definitions clause (regulation 2) that supplies the tariff vocabulary used throughout — ARR, availability under Availability Based Tariff with the thermal and transmission formulae, auxiliary consumption including emission-control auxiliary consumption, control period, cut-off date, integrated mine and its mining-plan-linked annual target quantity, the capital-expenditure scheme categories, asset-wise useful life (p15), and the short-, medium- and long-term procurement duration bands (pp10–11, 13).
Chapter 2 (pp17–19) sets the general principles: a Multi-Year Tariff framework built on a five-year control period (p17); the filing calendar, with the MYT petition due well before the control period starts, annual true-up filings by 30 November, and for distribution licensees annual tariff determination within the control period plus a mid-term review filed in the third year (pp17–18); the treatment of controllable and uncontrollable factors through later regulations 10 and 11 (p17); the required contents of the MYT petition and its supporting documents (pp18–19); and the Commission's power to stipulate trajectories for losses, reliability indices, AT&C loss and collection efficiency (p19).
The pages cross-refer to Chapters 4 to 7 and Chapter 9, and to Schedules 1, 2, 3 and 7 and Annexure V (pp7, 14, 16, 18, 19).
Read with this
The regulation
- Dated 13 Jul 2026Terms and Conditions of Tariff Regulations, 2026
Commencement notices and reasons
Earlier drafts
- Dated 13 Nov 2025Terms and Conditions of Tariff Regulations, 2025 — Draft
3 more documents belong here and are not on Voltaic: 1 draft or notice on a draft, 1 draft or notice on a draft not held as English text and 1 procedure or order made under it not held as English text.
Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.