Skip to content

WBERC · West Bengal Electricity Regulatory Commission

Terms and Conditions of Tariff Regulations, 2026 — Statement of Reasons

Statement of Reasons — West Bengal Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2026

Statement of reasonsDated 13 Jul 202682/WBERC dated 13th July, 2026

The commission's reasons for the Terms and Conditions of Tariff Regulations, 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is WBERC's Statement of Reasons (No. 82/WBERC dated 13.07.2026) for the West Bengal Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2026. It explains the legal basis for the fresh MYT tariff framework (pp1–2), records the public consultation on the draft 2025 regulations issued on 13.11.2025, the four extensions of the comment deadline to 22.06.2026, and the 18 stakeholders consulted (pp2–4).

The bulk (pp5–20) is an issue-wise record of stakeholder objections and the Commission's final decisions. Key outcomes: applicability is deferred from 01.04.2026 to 01.08.2026 while the five-year Ninth Control Period (FY 2026-27 to FY 2030-31) is maintained; existing tariffs as on 31.03.2026 continue until fresh determination (pp5–6). The proposed RoE penalty for delayed petitions is deleted (p6). The Bank Rate definition is retained (pp6–7). Capital expenditure approval thresholds are revised upward to Rs. 25 crore/0.5% GFA for generation and distribution and Rs. 50 crore for transmission, with the Non-DPR ceiling retained subject to variation by order (pp7–9). The 300 kCal/kg cap on GCV 'as received' for domestic coal is retained, and the proposed integrated-mine concession is not allowed (pp9–12). O&M escalation is revised to 4.80% and Schedule-6 recomputed (pp12–14). Equity-reduction provisos on useful-life completion are deleted (pp14–15). RoE and working-capital rates are retained (pp15–16). The existing 1.25% per month DPSC is retained, with an agriculture exception (p16). The CIL-price cap for captive coal is deleted (p17). Definitional issues, MYT framework, DVC-specific issues, other matters and filing formats are dealt with at pp17–20.

This is not the operative regulation text; it is the reasoning and decision record that analysts should read alongside the final Tariff Regulations 2026.

Standard name
Multi Year Tariff Regulations
Primary topics
Tariff determination, Multi Year Tariff (MYT), Return, financing and working capital

Read with this

The regulation

Other copies of these documents (1)

Earlier drafts

3 more documents belong here and are not on Voltaic: 1 draft or notice on a draft, 1 draft or notice on a draft not held as English text and 1 procedure or order made under it not held as English text.

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on wberc.gov.in ↗

Report an issue with this document