Terms and Conditions of Tariff Regulations, 2025 — Draft

West Bengal Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2025

Draft regulationDated 13 Nov 2025No. ../WBERC

Draft

A proposal that has since been finalised as the Terms and Conditions of Tariff Regulations, 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the draft West Bengal Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2025. It is made under the Electricity Act 2003 and, once notified, will extend to the whole State and apply to existing and future generating companies, transmission licensees and distribution licensees for determination of aggregate revenue requirement (ARR), tariff, mid-term review and truing-up from 1 April 2026 (p6). It also covers generating companies with integrated coal or lignite mines supplying specified end-use stations. It excludes generating stations of transmission licensees whose tariffs are competitively bid and adopted under section 63, and renewable/cogeneration stations governed by the WBERC 2013 RE regulations (p6–7). It supersedes Notification No. 48/WBERC dated 25 April 2011, subject to a saving for annual performance review and reviews up to 31 March 2026 under the then-prevailing tariff regulations (p6–7).

Chapter 1 (pp6–32) sets the short title, extent, applicability and commencement, and contains an extensive definitions section. The definitions cover regulatory accounts and accounting statements, ARR, admitted capital cost, additional capitalisation, availability and auxiliary consumption (including emission-control auxiliary consumption), change in law, control period, commercial operation date, integrated mines and mine infrastructure, useful life, open access, transmission capacity rights, and many other tariff concepts.

Chapter 2 (pp34–41) establishes the general principles: a five-year multi-year tariff (MYT) framework from 1 April 2026, petition contents and filing timelines, annual true-up, a mid-term review for distribution licensees, and the Commission's power to set trajectories for variables such as losses and reliability indices. It also provides for sharing or pass-through of controllable and uncontrollable variations.

The later schedules and annexures in the document include transmission-system availability procedures and an SIL table (pp274–276), depreciation schedules for assets before and after 1 April 2026 and for integrated mines (pp281–285), consumer categories and specific provisions (pp286–293), and a public-notice template for tariff, true-up and in-principle approval applications (pp294–297).

Standard name
Multi Year Tariff Regulations
Primary topics
Tariff determination, Multi Year Tariff (MYT), ARR and true-up

Read with this

The regulation

Commencement notices and reasons

Other copies of these documents (1)

3 more documents belong here and are not on Voltaic: 1 draft or notice on a draft, 1 draft or notice on a draft not held as English text and 1 procedure or order made under it not held as English text.

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.