Skip to content

UPERC · Uttar Pradesh Electricity Regulatory Commission

U.P. Electricity Supply Code, 2005 — Fifth Amendment, 2014

Electricity Supply Code (Fifth Amendment), 2014

AmendmentDated 22 Jul 2014UPERC/Secy/Regulations/Supply Code/2014/097 dated 24th July 2014

Amends a regulation Voltaic does not hold.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on uperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Fifth Amendment to the U.P. Electricity Supply Code, 2005, ordered by the Commission on 22 July 2014 and notified on 24 July 2014 to cure difficulties licensees reported in working the Code (p1). The preamble records that a public notice was issued in newspapers and on the UPERC website, stakeholder comments (including from NPCL) were received, and the Electricity Supply Code Review Panel met on 2 July 2014 to approve the changes (p1–2). The amendment comes into force on Gazette publication; the Gazette date is not printed (p2).

Six changes are made. A new sub-clause 4.4(a)(vii) carves out connections to jhuggis/hutments/Patri shopkeepers: temporary connection only, energised through prepaid meters, failing which the connection is confined to "upto 2 KW only", with a listed identity document required and all connection papers required to state that the connection is temporary and not proof of ownership; the conditions in sub-clauses (i)–(vi) are expressly disapplied and the licensee bears responsibility for electrical safety (p2–3). Clause 4.6(ii) replaces the word "commercial" with "non domestic" (p3). Clause 4.10(i)'s first proviso on temporary connections is substituted, and clause 6.9(B)(v) on load exceeding contracted load and additional charges is substituted — both printed only as two-column existing/amended tables whose text is too scrambled to read (p3–5). Clause 5.7 gains a new sub-clause (g) limiting the clause to cases where a double metering system/substation meter/audit meter exists and is healthy, prescribing per-day billing from that meter for a defective-meter period using the previous three months' difference, and falling back to the prevailing clause 5.7(d) where double metering is unavailable (p4).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Metering, Billing and payment

Read with this

Voltaic does not hold the regulation itself.

Commencement notices and reasons

One more document belongs here and is not on Voltaic: a consolidated copy not held as English text.

Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on uperc.org ↗

Report an issue with this document