UPERC · Uttar Pradesh Electricity Regulatory Commission
U.P. Electricity Supply Code, 2005 — Fifth Amendment, 2014
Electricity Supply Code (Fifth Amendment), 2014
AmendmentDated 22 Jul 2014UPERC/Secy/Regulations/Supply Code/2014/097 dated 24th July 2014
Amends a regulation Voltaic does not hold.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Fifth Amendment to the U.P. Electricity Supply Code, 2005, ordered by the Commission on 22 July 2014 and notified on 24 July 2014 to cure difficulties licensees reported in working the Code (p1). The preamble records that a public notice was issued in newspapers and on the UPERC website, stakeholder comments (including from NPCL) were received, and the Electricity Supply Code Review Panel met on 2 July 2014 to approve the changes (p1–2). The amendment comes into force on Gazette publication; the Gazette date is not printed (p2).
Six changes are made. A new sub-clause 4.4(a)(vii) carves out connections to jhuggis/hutments/Patri shopkeepers: temporary connection only, energised through prepaid meters, failing which the connection is confined to "upto 2 KW only", with a listed identity document required and all connection papers required to state that the connection is temporary and not proof of ownership; the conditions in sub-clauses (i)–(vi) are expressly disapplied and the licensee bears responsibility for electrical safety (p2–3). Clause 4.6(ii) replaces the word "commercial" with "non domestic" (p3). Clause 4.10(i)'s first proviso on temporary connections is substituted, and clause 6.9(B)(v) on load exceeding contracted load and additional charges is substituted — both printed only as two-column existing/amended tables whose text is too scrambled to read (p3–5). Clause 5.7 gains a new sub-clause (g) limiting the clause to cases where a double metering system/substation meter/audit meter exists and is healthy, prescribing per-day billing from that meter for a defective-meter period using the previous three months' difference, and falling back to the prevailing clause 5.7(d) where double metering is unavailable (p4).
Read with this
Voltaic does not hold the regulation itself.
Amendments and corrections
- Dated 16 Jun 2015UP Electricity Supply Code, 2005 — Sixth Amendment, 2015
- Dated 27 May 2016U.P. Electricity Supply Code, 2005 — Seventh Amendment, 2016
Commencement notices and reasons
One more document belongs here and is not on Voltaic: a consolidated copy not held as English text.
Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.