Skip to content

UPERC · Uttar Pradesh Electricity Regulatory Commission

UP Electricity Supply Code, 2005 — Sixth Amendment, 2015

Electricity Supply Code (Sixth Amendment), 2015

AmendmentDated 16 Jun 2015UPERC/Secy/Regulations/Supply Code/2015/550 dated 16th June 2015

Amends a regulation Voltaic does not hold.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on uperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a three-page UPERC notification amending the U.P. Electricity Supply Code, 2005. The covering letter (p1) transmits the Commission's order of 16 June 2015 to the Chairman, UP Power Corporation Ltd. The operative text (pp2–3) is the Electricity Supply Code (Sixth Amendment), 2015, made under s.50 of the Electricity Act and stated to come into force with immediate effect (p3).

The amendment touches only Annexure 4.1, the application form for requisition of supply of energy. Within the sub-heading for applicants seeking supply of more than 50 KW and for industrial purposes, existing sub-clause 17 is omitted and a new sub-clause 17 is inserted requiring the name and address of the person authorised to sign connection documents (p3). Under "Enclosures", points 1 and 2 are substituted — point 1 now calls for a work completion certificate and Test Report (B & L form) indicating tentative meter position; point 2 for documentary evidence of lawful occupation, or an indemnity bond where such evidence is unavailable. The enclosure requirements at points 3, 4 and 5 are omitted altogether (p3).

The recitals record that the Fifth Amendment was notified on 25 August 2014 and that licensees had reported difficulties with provisions of the Code (p2). This is a narrow, licensee-facing change to connection-application paperwork, not a tariff or supply-conditions change.

Standard name
Electricity Supply Code
Primary topics
New connections and load changes

Read with this

Voltaic does not hold the regulation itself.

Commencement notices and reasons

One more document belongs here and is not on Voltaic: a consolidated copy not held as English text.

Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on uperc.org ↗

Report an issue with this document