Skip to content

UPERC · Uttar Pradesh Electricity Regulatory Commission

U.P. Electricity Supply Code, 2005 — Seventh Amendment, 2016

Electricity Supply Code (Seventh Amendment), 2016

AmendmentDated 27 May 2016UPERC/Secy/Regulations/Supply Code/2016/066 dated 27.05.2016

Amends a regulation Voltaic does not hold.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on uperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Uttar Pradesh State Electricity Regulatory Commission issues the Seventh Amendment to the U.P. Electricity Supply Code, 2005, to address difficulties licensees face with the Code and its earlier amendments (p1). The preamble records that the Fifth Amendment was notified on 25 August 2014 and that addendums, substitutions and deletions have already been made; this amendment is made under section 50 of the Electricity Act 2003 (p1).

Clause 1 gives the short title, Electricity Supply Code (Seventh Amendment), 2016, and says it comes into force on publication in the Official Gazette (p2). Clauses 2–4 amend clause 2.2(ff) on the definition of "Independent feeder" for 11 kV supply, and clauses 3.2(ii)(b) and 3.2(iii).

Clauses 5–7 add to clause 6.1. Every consumer must register a mobile number, e-mail address or Aadhaar number within six months of the Gazette notification (p3). Licensees must provide soft copies of meter reading instrument data for consumer, double-pole or check meters on the registered e-mail address for Rs. 100/meter and hard copies at the registered address for Rs. 500/meter (p3). Where billing is by automatic meter reading, bills must state total supply availability time (p3).

Clauses 8–9 restructure clause 6.6. The existing self-assessed bill proviso becomes 6.6(i), retaining the conditions for deposit when no bill is received (p3). New clause 6.6(ii) introduces Trust Billing: consumers in towns with online billing may submit readings by e-mail and SMS, urban monthly and rural bimonthly; the licensee must integrate submissions so a bill is available within three days; no hard-copy bill is given unless requested (p3–4). Correct reading is the consumer's responsibility; understated readings are treated as unauthorized use and charged at one and half times the highest applicable energy charge; for unbilled cycles the licensee computes consumption using the LHFD formula in Annexure 6.3 of the 2005 Code (p4). Trust-billing consumers are flagged in the central server and excluded from handheld billing data, but their meters must be checked at least once every six months (p4). The amendment is signed by two Members and the Chairman on 27.05.2016 (p4).

Standard name
Electricity Supply Code
Primary topics
Billing and payment, Metering, Conditions of supply

Read with this

Voltaic does not hold the regulation itself.

Commencement notices and reasons

One more document belongs here and is not on Voltaic: a consolidated copy not held as English text.

Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on uperc.org ↗

Report an issue with this document