Skip to content

UPERC · Uttar Pradesh Electricity Regulatory Commission

Electricity Supply Code 2005 — Amendments and Clarifications Order

Issues related to Electricity Supply Code 2005

CodeDated 5 May 2005No. Secy/ UPERC/Supply Code/ 2005-115 dated 5.05.2005

Read with a regulation Voltaic does not hold.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on uperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a UPERC order of 5 May 2005 (p1) responding to difficulties that distribution licensees raised at a Commission meeting on 20 April 2005 (p2–3). It uses the Commission's remove-difficulties power under clause 9.5 of the Supply Code to do two things at once: amend specified clauses of the U.P. Electricity Supply Code, 2005, and clarify provisions where no change is needed. Page 1 is the Secretary's covering letter transmitting the order; page 2 sets out the references (letters from the discom MDs, UPPCL's CGM (Com) and Noida Power Company) and names UPPCL and each distribution licensee as respondents.

Item 1 (p3–4) widens the definition of "independent feeder" at clause 2.2(ff) so a feeder need no longer emanate only from a grid substation, and rewrites clause 3.4(b) to govern when supply on an independent feeder may be given at the consumer's request for loads above 500 KVA, with a proviso covering loads below that threshold where continuity of supply is required. Items 2 and 3 (p4) refuse changes: the 15-day hearing window in clause 6.8(b)(ii) stands, the Commission explaining that a hearing follows from section 126(3) of the Act and that "within" is a maximum; and the penalty multiples for unauthorized use, tampered meters and theft are retained and explained. Item 3 then issues the amended clause 8.4(a) on replacement of tampered meters and the assessment bill basis (p5). Item 4 clarifies that the "only for theft" factor in Annexure 6.3(ii) applies only to registered consumers (p5).

Item 5 (p5) deals with disconnection: the 7-day notice under section 24(1) of the 1910 Act is replaced by 15 days under section 56 of the 2003 Act, service is now governed by section 171, and the 1910 Act is stated to be repealed from 10.6.2003 — licensees must redraft their notices. Item 6 (p6) makes tidy-up amendments: clause 4.1's last proviso on arrears barring new connections, clause 4.8(b) communication timelines by voltage level, deletion of 4.7(g), renumbering of clause 5.1 and its last proviso, and clause 7.11 pointing to Annex 7.3. The Commission directs discoms to publicise the order and post it on their websites.

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Theft and unauthorised use

Read with this

Voltaic does not hold the regulation itself.

One more document belongs here and is not on Voltaic: a consolidated copy not held as English text.

Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on uperc.org ↗

Report an issue with this document