CERC · Central Electricity Regulatory Commission
Grant of Regulatory Approval for Execution of Inter-State Transmission Scheme to CTU Regulations, 2010 — First Amendment, 2015 — Draft
Central Electricity Regulatory Commission (Grant of Regulatory Approval for execution of Inter-State Transmission Scheme to Central Transmission Utility) (First Amendment) Regulations, 2015
Draft amendmentDated 16 Apr 2015No.L-1/41/2010-CERC dated 16 th of April 2015
Draft
A proposal that has since been finalised as the Grant of Regulatory Approval for Inter-State Transmission Scheme to CTU (First Amendment) Regulations, 2015.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a one-page CERC draft notification, dated 16 April 2015, proposing the First Amendment to the CERC (Grant of Regulatory Approval for execution of Inter-State Transmission Scheme to Central Transmission Utility) Regulations, 2010 (p1). It would insert a new sub-clause (iii) in clause (1) of Regulation 3 of the Principal Regulations (p1).
The insertion creates an additional route for an ISTS scheme proposed by the CTU to obtain regulatory approval: where a Solar Power Park Developer designated by the Central Government has sought long-term access, where consultation with CEA and with beneficiaries (wherever identified) has been held for setting up the scheme, and where the Solar Power Park Developer undertakes to bear all liabilities on behalf of the Solar Project Developers to be set up in the park (p1).
The draft is issued "after previous publications" and would take effect from the date of publication in the Official Gazette, which is not printed (p1). A Note records the Gazette publication details of the Principal Regulations, and the document is signed by the Chief (Law) (p1).
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 31 May 2010Grant of Regulatory Approval for Execution of Inter-State Transmission Scheme to CTU Regulations, 2010 — Statement of Objects and Reasons
- Dated 15 May 2015Connectivity, LTA and MTOA Regulations, 2009 and Regulatory Approval Regulations, 2010 — Fifth Amendment, 2015 — Statement of Reasons
Other copies of these documents (1)
Proposed changes (drafts with no final yet)
- Released with the notice dated 16 Apr 2015Explanatory memorandum: Explanatory Memorandum — Connectivity/LTA/MTOA (Fourth Amendment) and CTU Regulatory Approval (First Amendment) Regulations, 2015
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.