Grant of Regulatory Approval for Execution of Inter-State Transmission Scheme to Central Transmission Utility Regulations, 2010
Central Electricity Regulatory Commission (Grant of Regulatory Approval for execution of Inter-State Transmission Scheme to Central Transmission Utility) Regulations, 2010
RegulationDated 31 May 2010No. L-1/41/2010 - CERC dated 31st May, 2010
1 amendment to it is on Voltaic, dated 15 May 2015.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a CERC regulation setting out how the Central Transmission Utility (CTU) must obtain the Commission's regulatory approval before building inter-State transmission system (ISTS) schemes, so that network expansion can proceed without signed PPAs. The Preamble (p1) anchors it in the CTU's statutory duty under s.38(2)(c) of the Electricity Act and in the National Electricity Policy's position that prior agreement with beneficiaries is not a precondition for network expansion; the Notification (p1–2) cites s.79(1)(c) read with s.178(1) and (2)(ze).
Regulation 1 (p2) names the regulations and ties commencement to Gazette publication. Regulation 2 (p2–4) defines the working vocabulary — beneficiary, CTU, Generators, ISTS Scheme, National Electricity Plan, Project Inception Report and 'user' (a person connected to ISTS at 33 kV and above). Regulation 3 (p4–5) fixes scope: it covers ISTS schemes where generators have sought long-term access but PPAs are not yet signed, and system-strengthening/up-gradation schemes identified by CTU; it expressly excludes schemes where all beneficiaries or STUs have signed a Bulk Power Transmission Agreement.
Regulation 4 (p5–6) lays down the filing procedure — application with a Project Inception Report in the Appendix I format, content and co-ordination requirements, newspaper publication and website posting within seven days, and a one-month window for objections. Regulation 5 (p7) lists the evaluation criteria; Regulation 6 (p7–8) the three possible outcomes (approve with modifications, reject, or call for a fresh application), the route for minor scope changes such as bays and loop-in/loop-out, and the sequencing of implementation against generation projects. Regulation 7 (p8–9) provides for recovery of scheme charges through tariff determined under the prevailing tariff regulations, borne by users and shared per Commission-specified methodology. Regulations 8 and 9 (p9) give the Commission power to relax provisions and to remove difficulties. Appendix I (p10) is the application format.
Read with this
Amendments and corrections
Commencement notices and reasons
- Dated 31 May 2010Grant of Regulatory Approval for Execution of Inter-State Transmission Scheme to CTU Regulations, 2010 — Statement of Objects and Reasons
- Dated 15 May 2015Connectivity, LTA and MTOA Regulations, 2009 and Regulatory Approval Regulations, 2010 — Fifth Amendment, 2015 — Statement of Reasons
Other copies of these documents (1)
Proposed changes (drafts with no final yet)
- Released with the notice dated 16 Apr 2015Explanatory memorandum: Explanatory Memorandum — Connectivity/LTA/MTOA (Fourth Amendment) and CTU Regulatory Approval (First Amendment) Regulations, 2015
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.