Connectivity, LTA and MTOA Regulations, 2009 and Regulatory Approval Regulations, 2010 — Fifth Amendment, 2015 — Statement of Reasons

Amendments to Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) Regulations, 2009 and Central Electricity Regulatory Commission (Grant of Regulatory Approval for execution of Inter-State Transmission Scheme to Central Transmission Utility) Regulations, 2010

Statement of reasonsDated 15 May 2015

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission Regulations, 2009 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Commission's reasoned decision on two linked sets of draft amendments published for comment on 16 April 2015 (p2), explaining why they were adopted and in what modified form. It responds to the Government of India's solar park programme — MNRE's letter of 12 December 2014 setting out a framework for solar parks and for pooling/evacuation infrastructure (p1) — and to comments from PGCIL, NTPC, CEA, MNRE, APP, InWEA, Saurya Urja Company of Rajasthan and an individual (p2, pp4–5, pp8–9).

The core decision (pp3–7) makes a Solar Power Park Developer (SPPD) an eligible entity to apply for connectivity and long-term access to inter-State transmission, with the draft's word "designated" changed to "authorised" by the Central Government. The Commission declines to open eligibility generally to State-designated developers or to wind park developers, and clarifies that the SPPD acts as an agent of the generating companies.

A second amendment (pp7–11) would have made CTU's consideration of an SPPD application conditional on the developer bearing all operational and commercial responsibilities; that proviso is narrowed to authorisation for infrastructural activities, because scheduling, metering, energy accounting, DSM and congestion charges are referred to a detailed procedure to be prepared by NLDC within one month, followed by an IEGC amendment (p10).

The SoR then settles three further questions: the transmission system inside a solar park is a dedicated transmission line and needs no transmission licence (pp11–13); transmission charges for delay in commissioning stay payable by the generators/SPPD despite the solar exemption in the Sharing Regulations, which applies only after commercial operation (pp13–15); and SPPD's costs are to be borne by generators through their own agreements (pp15–16). It ends with the parallel amendment to the Regulatory Approval Regulations, 2010, allowing CTU to seek regulatory approval for an ISTS scheme tied to an authorised SPPD's LTA application (pp16–17).

Standard name
Connectivity and GNA Regulations, Open Access Regulations
Primary topics
Connectivity and GNA, Open access, Network planning and investment

Read with this

Read with this: Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission Regulations, 2009

Other copies of these documents (7)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

It is also read with: Grant of Regulatory Approval for Execution of Inter-State Transmission Scheme to Central Transmission Utility Regulations, 2010

The commission's reasons for the Grant of Regulatory Approval for Execution of Inter-State Transmission Scheme to Central Transmission Utility Regulations, 2010 or one of its amendments.

Other copies of these documents (1)

Proposed changes (drafts with no final yet)

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document