Consultative Paper and Draft Generic Levellised Tariff for FY 2025-26 for Renewable Energy Sources

Consultative Paper for determination of generic levellised Tariff for FY 2025-26 for Power Generated from Renewable Energy Sources

Draft regulationDated 26 Dec 2025

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on berc.co.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Bihar Electricity Regulatory Commission has issued a consultative paper enclosing a draft order to determine generic levellised tariffs for FY 2025-26 for renewable energy projects. It recalls that the BERC (Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulations, 2025 were notified (p1; the draft order gives a different date, 05.11.2025, at p4) with a three-year control period from FY 2025-26 to 2027-28, and that Regulation 8 requires annual generic tariffs for biomass Rankine-cycle projects, non-fossil-fuel cogeneration, biomass gasifier projects and MSW/RDF Rankine-cycle projects. The paper invites comments by 19.1.2026 and a hearing on 22.1.2026 (p2).

The draft order (pp3-20) sets out the legal framework, useful lives, control period, tariff structure and levellisation principles. It explains that generic tariffs are levellised over useful life, with a discount factor equal to post-tax weighted average cost of capital; it then proposes technology-specific normative capital costs, debt-equity, return on equity, interest on loan, depreciation, working capital, O&M, PLF, auxiliary consumption, station heat rate, fuel mix and fuel-price assumptions for FY 2025-26. It also describes how accelerated depreciation and income-tax benefits are to be factored in. The resulting table gives fixed and variable components and tariffs with and without accelerated depreciation for the covered technologies (pp19-20).

The order is stated to be effective from 01.04.2025 and applies to projects in Bihar selling electricity to beneficiaries; it is to cover projects commissioned up to 31.03.2026 and continue thereafter until the next generic order (p20). Annexures I to XIII (pp21-59) give technology-wise norms and year-wise computations supporting the levellised fixed tariffs.

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Generation tariff, Tariff determination

Read with this

Proposed changes (drafts with no final yet)

Earlier drafts

Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on berc.co.in ↗

Report an issue with this document