Skip to content

BERC · Bihar Electricity Regulatory Commission

Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2025

Bihar Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2025

RegulationDated 7 Nov 2025Published in the Gazette 27 Nov 2025In force from 1 Apr 2025BERC-SMP-29/2025-06 dated The 7th November 2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on berc.co.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is Bihar's principal tariff regulation for renewable energy. Notified by BERC on 7 November 2025 and gazetted on 27 November 2025 (p1), it takes effect retrospectively from 1 April 2025 and is stated to run three years from commencement unless reviewed or extended earlier (p1). It replaces the 2022 regulations of the same name (p16).

Regulations 1–2 give the title, commencement, extent and a technology-heavy definition set, including a useful-life table by RE technology (p1–4). Regulation 3 confines application to grid-connected RE generating stations commissioned during the Control Period whose tariff the Commission determines under s.62 read with s.86; Regulation 4 sets technology-by-technology eligibility screens (p4–6).

Chapter 1 (Regs 5–12) carries the general principles: a three-year Control Period beginning FY 2025-26 (p6); tariff period equal to useful life; competitive bidding under s.63 with tariff adoption as the default for solar, solar thermal, floating solar, hybrid, storage and non-fossil co-generation projects; an unnumbered project-specific-tariff clause with a petition checklist (p7); annual generic tariffs for biomass, co-generation, gasifier and MSW/RDF (p8); tariff structure, levelised design and over-generation treatment (p8); and must-run and dispatch rules that exempt larger biomass and co-generation plants (p9).

Chapter 2 (Regs 13–24) fixes the common financial principles — capital cost scope, debt-equity, loan tenure and interest, depreciation, return on equity, working capital, CUF/PLF hour basis, O&M escalation, rebate, late payment surcharge, subsidy and statutory charges (p9–12).

Chapters 3–9 (Regs 25–64) give technology-specific parameter sets for biomass Rankine, non-fossil co-generation, biomass gasifier, MSW/RDF, solar PV/thermal/floating, RE with storage and renewable hybrid projects, each covering capital cost, PLF/CUF, auxiliary consumption, heat rate or fuel consumption, O&M and fuel cost — several of these left to case-by-case determination (p12–16). Chapter 10 (Regs 65–70) deals with deviation from norms, precedence of government policy, powers to relax, remove difficulties and amend, and repeal and savings (p16). The Appendix supplies four assumption and tariff-computation forms (p17–21).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Competitive bidding

Read with this

Earlier drafts

Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of BERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on berc.co.in ↗

Report an issue with this document