BERC · Bihar Electricity Regulatory Commission
RE Tariff Regulations, 2025 — Draft
Bihar Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2025
Draft regulationDated 12 Aug 2025
Draft
A proposal that has since been finalised as the Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Bihar Electricity Regulatory Commission has issued a consultative paper proposing a new set of renewable-energy tariff regulations for Bihar. The paper explains that the Commission is using its powers under the Electricity Act, 2003 to specify tariff terms for RE generation, and that it intends to adopt the changes made in the CERC RE Tariff Regulations, 2024. The proposed control period is three years, from FY 2025-26 to FY 2027-28, and the existing BERC RE Tariff Regulations, 2022 are proposed to be repealed (p1–2). Stakeholders are invited to comment by 11.9.2025, and the Commission will hear the matter on 16.9.2025 (p2). The draft regulations themselves run from p3 to p40.
The draft begins with short title, commencement, extent and definitions (p3–9). It defines the control period, tariff period, useful life, and a wide set of RE technologies and project types, including floating solar, renewable hybrid, RE with storage, small hydro, biomass, MSW and RDF (p3–9). Regulation 3 sets the scope: grid-connected RE generating stations commissioned during the control period, with eligibility criteria in Regulation 4 for each technology (p9–12).
Chapter 1 (General Principles, p13–19) covers the control period, tariff period, competitive bidding under section 63, project-specific tariff under section 62, petition requirements, tariff structure and design, treatment of over-generation, and dispatch principles. It makes most RE plants must-run, with exceptions for biomass of 10 MW and above and non-fossil fuel cogeneration (p18).
Chapter 2 (Financial Principles, p20–26) specifies the financial building blocks: capital cost, debt-equity ratio, loan tenure and interest, depreciation, return on equity, working capital, capacity utilisation and plant load factor, O&M expenses, rebate, late payment surcharge, treatment of subsidy or incentive, and statutory charges.
Chapters 3 to 9 set technology-specific parameters. Chapter 3 covers biomass power based on Rankine cycle technology (p27–29); Chapter 4 covers non-fossil fuel based cogeneration (p30–31); Chapter 5 covers biomass gasifier projects (p32–33); Chapter 6 covers municipal solid waste and refuse-derived fuel projects (p33–35); Chapter 7 covers solar PV, solar thermal and floating solar projects (p35–36); Chapter 8 covers renewable energy with storage projects (p36–37); and Chapter 9 covers renewable hybrid energy projects (p37–38). Each chapter specifies which parameters are normative and which are to be determined project-specifically.
Chapter 10 (Miscellaneous, p39–40) provides for deviation from norms, prevalence of guidelines from the Ministry of Power, MNRE, State Government or other competent authority, power to relax, power to remove difficulties, power to amend, and repeal and savings. The draft's repeal clause names the 2017 Regulations, while the consultative paper says the 2022 Regulations are proposed to be repealed (p2, p40).
Read with this
The regulation
Proposed changes (drafts with no final yet)
Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.