Consultative Paper for determination of generic levellised Tariff for FY 2026-27 for Power Generated from Renewable Energy Sources

Draft regulationDated 5 May 2026

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on berc.co.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Bihar Electricity Regulatory Commission has issued a consultative paper inviting comments on its draft determination of generic (levellised) tariff for FY 2026-27 for power from renewable energy sources (p1). It sits under the BERC (Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulations, 2025, stated as notified on 27 November 2025, which fix a three-year control period of FY 2025-26 to 2027-28 and allow the benchmark capital cost to be reviewed annually (p1–2). FY 2026-27 is the second year of that period.

The draft order covers four technology families: biomass power on Rankine cycle, non-fossil-fuel-based cogeneration, biomass gasifier, and MSW/refuse-derived fuel on Rankine cycle (p1, p4). It restates the tariff structure — a single-part tariff of fixed cost components, or a fixed-plus-fuel two-part structure for fuel-based projects (p6) — and the levellisation principle under which the discount factor equals the post-tax weighted average cost of capital (p6–7).

Substantively, the draft proposes technology-wise normative capital costs, the debt-equity split, return on equity grossed up by MAT and corporate tax rates, interest on loan benchmarked to SBI MCLR plus a spread, depreciation and working-capital norms, O&M escalation, plant load factor, auxiliary consumption, station heat rate, and fuel prices with escalation factors (p8–17). It also deals with accelerated depreciation benefit and with central/state grants or subsidies (p17–18), then presents the resulting generic tariff for each technology with and without accelerated depreciation (p18–19).

The tariff is to apply to RE projects commissioned up to 31.03.2027, and continues for projects commissioned after 31 March 2027 until the Commission approves the next generic levellised tariff order (p2, p19–20). It is effective from the date of issue and applies to projects located in Bihar selling electricity to beneficiaries (p20). Other terms of the RE Tariff Regulations, 2025 remain unchanged, and the Commission reserves the right to alter or modify the order (p20).

Comments are invited by 22.5.2026 and the Commission will hear the matter on 26.5.2026 at 11.30 AM (p2). Annexures I to XIII give, in pairs, the technology-wise norms and parameters (A sheets) and the year-wise levellised computations over the project's useful life (B sheets) (p21–59).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Capital cost and investment

Read with this

Proposed changes (drafts with no final yet)

Earlier drafts

Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.