Skip to content

UERC · Uttarakhand Electricity Regulatory Commission

Uttarakhand Deviation Settlement Mechanism and Related Matters (First Amendment) Regulations, 2022

Uttarakhand Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) (First Amendment) Regulations, 2022

AmendmentDated 19 Jul 2022No. F-9(26)(i)/RG/UERC/2022/510 dated July, 19, 2022

Amends the Deviation Settlement Mechanism and Related Matters Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the first amendment to UERC's 2017 Deviation Settlement Mechanism Regulations, notified on 19 July 2022 (p1). It rebuilds the framework that decides what buyers and sellers in Uttarakhand pay or receive when they deviate from schedule.

Regulation 3 replaces Table-1 of the principal regulations with a market-linked price vector: the charge at 50.00 Hz is the daily simple average Area Clearing Price discovered in the Day Ahead Market, with slopes running to zero at 50.05 Hz and down to a floor below 49.85 Hz (pp2–4). New definitions of Area Clearing Price, Daily Base DSM Charge and Day Ahead Market are inserted, and 'Time Block' is redefined as 15 minutes (pp1–2). The notes set which exchange's price is used, the fallback when there is no trade, rounding, and make NLDC the nodal agency for daily DSM rates, with a proviso allowing the Commission to review the basis within a year (pp3–4).

Regulations 4 and 5 narrow the operating frequency band from 49.70–50.10 Hz to 49.85–50.05 Hz through Regulations 7 and 8, and replace the sustained-deviation sign-change obligation with a graded table of additional charges for violations, exempting certain renewable and testing-related flows (pp4–6). Regulations 6 and 7 make consequential substitutions in Annexures I and II (p7), and Annexure-I works the price vector algebraically (p8). It commences six months after Gazette notification (p1).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Power markets and exchanges

Read with this

6 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft, 2 copies in another language and 1 draft or notice on a draft not held as English text.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document