Summary written by software. Check the regulator's original before you rely on it.
This is the Uttarakhand Electricity Regulatory Commission's principal instrument for settling deviations from schedule on the intra-State grid. Notified on 6 February 2017 under Section 181 of the Electricity Act, 2003, it comes into force on 1 April 2018 (p1) — more than a year after notification. Regulation 3 states the objective as maintaining grid discipline and security through a commercial mechanism, aligned to the CERC (Indian Electricity Grid Code) Regulations, 2010 and the UERC (State Grid Code) Regulations, 2016 (p3).
Regulation 4 fixes who it binds: buyers and sellers on the State Grid — State distribution licensees, intra-State generating stations and open access customers. Renewable energy sources (SHPs, wind, solar, biomass, co-generation, biogas and similar) are expressly excluded until the Commission decides otherwise, though RE sources connected at 11 kV and above must still submit schedules to SLDC; generators on the inter-State network selling outside the State follow the CERC DSM Regulations, 2014 (p3).
Regulation 5 sets frequency-linked charges for deviation in 15-minute time blocks (table spanning pp3–4), with zero receivables for deviation beyond 10% of schedule and ceiling rates for infirm power injected before COD, differentiated by fuel type (p4). Regulation 6 routes declaration, scheduling and anti-gaming through the State Grid Code, the RE tariff regulations and the open access regulations, and lets the Commission disallow deviation charges where gaming is established (pp4–5). Regulation 7 defines the permissible deviation volume band and the frequency bands in which over-drawal, under-drawal, under-injection and over-injection are prohibited; Regulation 8 layers graded additional charges beyond the volume limit, a full add-on below 49.70 Hz, and a requirement to reverse the sign of accumulated deviation at least once every 12 time blocks (pp5–7).
Regulation 10–12 make SLDC compute and publish deviation accounts weekly, hold collections in a State Deviation Pool Account under a fixed appropriation order, and sweep monthly surpluses to a State Power Systems Development Fund; Regulation 11 sets payment deadlines, delay interest and a 110% Letter of Credit requirement for parties that defaulted in the previous year (pp7–8). Regulations 13–16 give the Commission powers to relax, direct, amend and remove difficulties; Annexures I and II give the step-by-step computation methodology for over-drawal/under-injection and for under-drawal/over-injection respectively (pp9–10).
Read with this
Amendments and corrections
Commencement notices and reasons
6 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft, 2 copies in another language and 1 draft or notice on a draft not held as English text.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of UERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.