Skip to content

UERC · Uttarakhand Electricity Regulatory Commission

Deviation Settlement Mechanism & Related Matters (First Amendment) Regulations, 2022 — Statement of Reasons

Uttarakhand Electricity Regulatory Commission (Deviation Settlement Mechanism & Related Matters) (First Amendment) Regulations, 2022

Statement of reasonsDate not stated

The commission's reasons for the Deviation Settlement Mechanism and Related Matters Regulations, 2017 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Commission's Statement of Reasons for the UERC (Deviation Settlement Mechanism & Related Matters) (First Amendment) Regulations, 2022 — the explanation of why the first amendment to the state's 2017 DSM Regulations was finalised as it was. Pages 1–2 set out the background: the 2017 Principal Regulations (notified 06.02.2017) had stood unamended, while CERC amended its own DSM Regulations 2014 by the Fourth Amendment (20.11.2018) and Fifth Amendment (28.05.2019); the Grid Co-ordination Committee proposed aligning the state regulations with CERC, a draft amendment was published for comment, and four stakeholders responded by the 22.03.2022 deadline.

Pages 2–4 record each comment and the Commission's decision. UJVNL's request to replace the flat ±2% deviation-correction band with CERC's ±20 MW or HPERC's sustained-deviation table was refused, the Commission holding that the state limits suit local grid conditions. Its request for a further exemption (sudden breakdown of a generating unit) under the third proviso to Regulation 5(7) was refused as already covered by the State Grid Code. Sravanthi Energy's start-up-schedule exemption was refused for want of consistency with CERC. CER IIT Kanpur's proposal to use a region-specific Area Clearing Price for the N2 region instead of a country-wide average was accepted — the one change the Commission took on board.

UPCL's two suggestions were both refused: open access consumers stay within intra-state DSM (p4), and renewable energy generators stay outside for now, with inclusion deferred to future regulations aligned with CERC DSM 2022, which the document says is notified but not yet implemented (p4). Annexure-I (p5) lists the four commenting stakeholders.

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Open access

Read with this

Commencement notices and reasons

6 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft, 2 copies in another language and 1 draft or notice on a draft not held as English text.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document