UERC · Uttarakhand Electricity Regulatory Commission
Deviation Settlement Mechanism and Related Matters Regulations, 2017 — Explanatory Memorandum
Explanatory Memorandum for Uttarakhand Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2017
Statement of reasonsDate not stated
The commission's reasons for the Deviation Settlement Mechanism and Related Matters Regulations, 2017 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Uttarakhand Electricity Regulatory Commission's explanatory memorandum, or statement of reasons, issued with the UERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2017. It explains why the Commission is extending the Availability Based Tariff/deviation settlement framework from the inter-state to the intra-state level in Uttarakhand. It is a reasoning and consultation document: the operative regulation text, deviation price bands and formulae are not reproduced here (p1–4).
Pages 1–2 give the background and philosophy. The memorandum traces the framework to the CERC Unscheduled Interchange Regulations, 2009, later superseded by the CERC DSM Regulations, 2014, and describes how ABT works: participants declare generation and drawal schedules in 15-minute time blocks a day ahead, and deviation from the schedule is priced according to system frequency. It lists the intended objectives of ABT/DSM, including grid discipline, trade in energy and capacity, economic load despatch and higher generation availability (p1). It then argues that large deviations threaten grid stability and that, lacking an intra-state DSM, the financial impact of deviations by generators and consumers currently falls on UPCL, the State's sole distribution licensee, which the Commission considers wrong from an accountability standpoint (p2).
Page 2 sets the objective: to push distribution utilities and open access customers towards planned procurement and generators towards adhering to scheduled injection, with utilities expected to tie up power on long-term, medium-term and short-term basis rather than rely on over-drawal. Intra-state ABT is presented as rewarding those who support grid discipline and penalising those who deviate, building a frequency-linked pricing mechanism.
Page 3 covers applicability. It fixes commencement from 01.04.2018 to give generators, the State Transmission Utility, transmission licensees, SLDC, distribution licensees and open access users time to complete pre-requisites such as ABT-compliant special energy meters, SCADA and an Automatic Demand Management Scheme, in line with the UERC (State Grid Code) Regulations, 2016. SLDC is designated Nodal Agency to direct State Constituents.
Page 4 is Annexure-I, listing the stakeholders who commented on the draft and the participants at the public hearing.
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
6 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft, 2 copies in another language and 1 draft or notice on a draft not held as English text.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.