WBERC · West Bengal Electricity Regulatory Commission

Cogeneration and Generation of Electricity from Renewable Sources of Energy Regulations, 2013 — First Amendment, 2020

West Bengal Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy) (First Amendment) Regulations, 2020

AmendmentDated 21 Dec 2020Published in the Gazette 22 Dec 2020No. 71/WBERC dated 21st December, 2020

Amends the Cogeneration and Generation of Electricity from Renewable Sources of Energy Regulations, 2013.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the First Amendment, 2020, to WBERC's 2013 Cogeneration and Renewable Sources of Energy Regulations, issued as notification No. 71/WBERC dated 21 December 2020 and gazetted on 22 December 2020 (p1). It comes into force on gazette publication and applies across West Bengal. It rewrites the Commission's renewable purchase obligation (RPO) framework and creates a full rooftop-solar net-metering / net-billing regime.

On definitions and RPO, it inserts new definitions of 'Eligible Consumer', net metering and net billing arrangements, net meter and the two connection agreements, substitutes the definitions of 'Renewable Energy Sources' and 'RPO', and deletes two old clauses (pp1–2). Regulations 3.0–3.1 are replaced with a year-wise RPO target table for 2020-21 to 2022-23 binding distribution licensees, captive plants of 1 MW and above on fossil fuel, and open access consumers, with a chain of provisos on hydro exclusion, compulsory waste-to-energy procurement, solar/non-solar shortfall set-off, continuation of existing PPAs, special treatment of captive plants by commissioning date, and open access consumers drawing partly in consumer mode (pp2–3). Regulation 3.2 is replaced (obligation on energy input into the licensee's system; RPO trajectory after 2023-24 by separate order) and 3.3 deleted (p3). References to cogeneration are stripped out of regulations 3.4, 3.7, 3.9 and 3.13; 3.4(iv) is replaced with permitted purchase routes and a new 3.4(viii) allows REC purchase as a last resort; 3.5 imposes advertising and portal/bidding participation duties; 3.10 is replaced with rules crediting excess renewable energy of open access and captive consumers, and of rooftop-solar consumers, toward the licensee's RPO; 3.11 and 3.13 are deleted (pp3–4). Regulation 4.0 and 4.1 are deleted and a new 4.2 permits purchase from fossil-fuel cogeneration at a mutually agreed price within a ceiling, without RPO credit; regulation 5.3 is replaced with a competitive-bidding requirement for solar purchases, with exceptions (p4).

The rooftop-solar core is regulation 6.1(v)(c), which ties installation to sanctioned load / contract demand and splits eligible consumers between net metering and net billing on a 5 kW threshold, with a carve-out for agriculture consumers; regulation 7.2 is replaced with detailed interconnection and metering requirements, including capacity limits, CEA standards, anti-islanding, harmonics, testing and ToD-capable meters (pp4–6). Regulation 16.9 requires each licensee to file a detailed connectivity procedure within 30 days (p6). Schedule-1 (pp6–7) sets net-metering energy accounting and settlement, including carry-forward, the 90% cap, annual reset and treatment of inadvertent injection; Schedule-2 (pp7–8) sets net-billing accounting, the tariff/PPA basis and the consumer billing equation with Billing Credit carry-forward.

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Net metering, Net billing

Read with this

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.