West Bengal Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy) (First Amendment) Regulations, 2020
Draft amendmentDated 11 Jun 2020WBERC/Regulation-64/20-21 /5729
Draft
A proposal that has since been finalised as the Cogeneration and Generation of Electricity from Renewable Sources of Energy Regulations, 2013 — First Amendment, 2020.
Summary
Summary written by software. Check the regulator's original before you rely on it.
Page 1 is a public notice: the Commission invites objections, suggestions and comments on the draft First Amendment Regulations, to be submitted by 30.06.2020 (up to 5 P.M.), and points to the Commission's website for details. The draft notification begins on page 2 and is made under the Electricity Act, 2003 to amend the WBERC (Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2013 (notification no. 50/WBERC dated 22 March 2013). It extends to West Bengal and is to commence on publication in the Official Gazette.
Pages 2–3 amend definitions in regulation 2.1: a new 'Eligible Consumer' definition covers solar PV consumers with systems of 1 kW and above on rooftops or other mounting structures, including housing societies with common loads; new definitions cover net billing, net metering, net meters and their connection agreements; 'Renewable Energy Sources' is redefined; two existing clauses are deleted.
Pages 3–5 rewrite the renewable purchase obligation (RPO) provisions. Regulation 3.1 is replaced with a table of minimum solar, non-solar and total purchase percentages for 2020-21 to 2022-23, with provisos on the consumption base, compulsory waste-to-energy procurement, cross-compliance between solar and non-solar, and continuation of existing PPAs. Regulation 3.2 states the obligation base and leaves the post-2023-24 RPO trajectory to a separate Commission order. Regulation 3.3 is deleted. Regulation 3.4(iv), 3.5 and 3.10 are substituted to cover procurement routes, advertising and competitive bidding, and RPO credit for open access and rooftop solar; regulation 3.11 is deleted. Regulation 5.3 is replaced to require competitive bidding for solar power, with exceptions for eligible consumers and certain NSM/SECI purchases.
Pages 6–8 deal with solar PV installation and interconnection. Regulation 6.1(v)(c) is substituted to allow eligible consumers to install solar PV for injection, subject to capacity limits and a split between net metering (domestic up to 6 kW and agriculture) and net billing (other consumers above 6 kW), on a non-discriminatory first-come-first-served basis, with existing net-metered systems continuing. Regulation 7.2 is replaced with detailed interconnection, safety, anti-islanding, metering and harmonic requirements. Regulation 8.0–8.2 terminology is changed from 'unscheduled interchange' to 'deviation settlement', and a new regulation 16.9 requires each distribution licensee to prepare a connectivity application procedure for Commission approval within 30 days.
Pages 8–11 insert Schedule-1 on net metering energy accounting and settlement and Schedule-2 on net billing energy accounting and settlement, covering billing-period information, carry-forward of excess generation, time-of-day set-off, year-end treatment of excess energy or billing credit, fixed charges, and the net billing equation.
Read with this
The regulation
Amendments and corrections
Commencement notices and reasons
- Dated 20 Dec 2020Statement of Reasons — RE First Amendment, 2020
Earlier drafts