WBERC · West Bengal Electricity Regulatory Commission

Cogeneration and Generation of Electricity from Renewable Sources of Energy Regulations, 2013

West Bengal Electricity Regulatory Commission (Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2013

RegulationDated 22 Mar 2013Published in the Gazette 22 Mar 2013No. 50/WBERC dated the 22nd March, 2013

1 amendment to it is on Voltaic, dated 21 Dec 2020.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on wberc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

Notification No. 50/WBERC of 22 March 2013, published in the Kolkata Gazette Extraordinary the same day, replaces WBERC's 2010 cogeneration and renewable-energy regulations with a full regime covering renewable purchase obligations, price caps, connectivity, dispatch and open access across West Bengal (p1, p19).

Regulation 1 fixes the title, the extent (whole of West Bengal) and commencement on Gazette publication. Regulation 2 supplies the vocabulary — renewable sources, small hydro, RPO, REC, Nodal Agency, State Agency, the Ultimate Target — and defers to the Act and other WBERC regulations for undefined terms (p1–3).

Regulation 3 is the core obligation: a five-year RPO trajectory to 2017-18 with separate solar and combined cogeneration-plus-renewable percentages of consumption, continuing annual increases until the Ultimate Target, the permitted routes to comply (own generation, purchase, RECs at pooled cost, open access, bundled JNNSM solar, out-of-state purchase), advertising and annual reporting duties, and accounting of open access drawal and wheeling/transmission losses towards the licensee's RPO (p3–6). Regulation 4 states when s.142 proceedings may follow non-compliance and what excuses a licensee (p6).

Regulation 5 sets how prices are settled — mutual agreement within a cap, cost-data disclosure, Commission approval of PPAs, competitive bidding for solar — and Regulation 6 then specifies source-wise price caps, validity periods, annual escalation formulae for two-part tariffs, fuel-mix monitoring and audit, review of caps by vintage, fresh PPAs for existing biomass and cogeneration plants, and R&M treatment (p6–14).

The remainder covers delivery: connectivity voltage levels and cost-sharing (reg 7), must-run status versus ABT/UI dispatch (reg 8), CDM proceeds to the generator (reg 9), open access rights and the charges regime including metering charges (regs 10–15), the procurement procedure and mandatory PPA contents (reg 16), an in-principle clearance route (reg 17), amendment and review powers (regs 18–19), and repeal of the 2010 regulations with savings (reg 20) (p15–19).

Standard name
RPO Regulations, Renewable Energy Tariff Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy tariff, Open access

Read with this

Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of WBERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on wberc.gov.in ↗

Report an issue with this document