Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Grid Code, 2005 — Amendment (Wind Scheduling), 2013

Notification No. TNERC / GC/ 13-2, dated 12-09-2013

AmendmentDated 12 Sep 2013Published in the Gazette 2 Oct 2013TNERC / GC/ 13-2 dated 12-09-2013

Replaced by Tamil Nadu Electricity Grid Code, 2026

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Tamil Nadu Electricity Grid Code.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-clause amendment to the Tamil Nadu Electricity Grid Code, 2005, issued by the Tamil Nadu Electricity Regulatory Commission as Notification No. TNERC/GC/13-2 dated 12-09-2013 and printed in the Tamil Nadu Government Gazette of 2 October 2013 (p1). Its single purpose is to bring wind generation inside the state's scheduling and despatch framework.

The first change substitutes regulation 8(3)(a) (p1-2): the SLDC is to issue the despatch instructions needed to regulate all generation and imports from state sector generating stations, IPPs, CPPs and generators based on renewable sources of energy, according to the hourly day-ahead generation schedule, unless unforeseen circumstances require rescheduling. Wind mill generation is to be scheduled as per the Commission's Intra State Availability Based Tariff order or regulation in force (p2).

The second change substitutes regulation 8(4)(i) (p2), replacing the expression that covered 'NCES (excluding windmills)' with 'Generators based on renewable sources of energy' in the SLDC's scheduling and despatching duty.

The Explanatory Statement (p2) gives the reason: the 2005 Code excluded wind mills from scheduling, while the CERC Indian Electricity Grid Code Regulations, 2010 provide for scheduling of wind energy generators; the amendment aligns the state code with the central framework to secure stable, secure and economic despatch. Page 3 reproduces the existing and amended provisions side by side. No commencement date, savings clause or transitional provision is stated.

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Deviation settlement (DSM)

Read with this

The regulation

Proposed changes (drafts with no final yet)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document