Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Grid (Amendment) Code, 2012 — Draft

Tamil Nadu Electricity Grid (Amendment) Code, 2012

Draft amendmentDated 16 Aug 2012TNERC / GC/ 13/ dated . -08-2012

Draft

A proposal that has since been finalised as the Tamil Nadu Electricity Grid Code, 2005 — Amendment (Wind Scheduling), 2013.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page draft amendment published by the Tamil Nadu Electricity Regulatory Commission for public comment, proposing changes to regulation 8 of the Tamil Nadu Electricity Grid Code, 2005 (p1–2). The preamble records that the Grid Code was notified in Part VI, Section 2 of the Tamil Nadu Government Gazette on 14 December 2005, and states that the Commission is using its powers under section 86(1)(h) and section 181(2)(zp) of the Electricity Act, 2003 to amend it (p1).

Page 1 is the notice: the proposed amendments will be gazetted no earlier than fifteen days after being hosted on the Commission's website, and suggestions, modifications or objections are to be sent to the Secretary, TNERC, Chennai, within that window (p1). Clause 1 names the instrument the Tamil Nadu Electricity Grid (Amendment) Code, 2012 and makes it commence on the date of Gazette publication (p1–2).

Clause 2 makes two changes to regulation 8 (p2). It substitutes clause (a) of sub-regulation (3) with a provision requiring the SLDC to issue despatch instructions regulating all generation and imports from SSGS, IPPs, CPPs and NCES against the hourly day-ahead generation schedule, unless rescheduling is needed for unforeseen circumstances, and requiring wind generation to be scheduled under the Commission's Availability Based Tariff order or regulation in force (p2). It also omits the words "(excluding wind mills)" from clause (i) of sub-regulation (4) (p2). Read together, the changes remove the carve-out for wind mills and place them inside the scheduling and despatch regime.

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Deviation settlement (DSM)

Read with this

The regulation

Proposed changes (drafts with no final yet)

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document