Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Grid Code — Draft Amendments, 2022

Draft of amendments to the Tamil Nadu Electricity Grid Code

Draft codeDated 22 Mar 2022No.TNERC/GC/13- –……. dated .03.2022

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a TNERC draft notification proposing a package of amendments to the Tamil Nadu Electricity Grid Code, published for the information of affected persons under s.181(3) of the Electricity Act 2003, with objections or suggestions due by 21.04.2022 (p1). The Code being amended was notified in October 2005 and took effect on 14 December 2005 (p23).

The amendment opens with the glossary (p1–3): two existing definitions are replaced — connection point and National Grid — and ten new ones inserted, covering COD, Deviation Settlement Mechanism Regulations, ex-power plant output, IPP, operating range, power exchange, regional and state entity, technical minimum schedule and trial operation. Regulation 3 is then changed so the Code must also be read with the Indian Electricity Grid Code (p3).

The planning and connectivity chapters are updated to bring in 765 kV and HVDC (p3–5): additional contingency outages for planning, a 765 kV substation switching scheme, a revised stuck-breaker limit graded by voltage level, generating-station switchyard voltage options including 765 kV, and 765 kV line protection.

The largest block rewrites the operating code for generators (p5–11): which units must keep governors in operation, by fuel and size; the restricted governor mode and its features; droop settings and ripple filtering; exemptions for low-pondage hydro, wind, solar and nuclear; primary-response capability and Valve Wide Open restrictions; AVR and power system stabiliser obligations; protection coordination and islanding; a frequency band to be maintained; and a voltage operating table. Regulation 7(4) is replaced with load-shedding and demand-management duties (p11).

The regulation 8 amendments (p12–22) tie wind and solar scheduling to the Commission's forecasting and deviation settlement regulations and insert a full commercial-operation framework — COD and trial-run tests for thermal, hydro, transmission and communication assets, with SLDC clearance timelines and precedence over the 2005 Tariff Regulations — plus a technical minimum schedule, with compensation for stations directed to run below normative availability. Regulation 9(2)(ix) is omitted (p22). An explanatory statement (p23) and a side-by-side comparison of existing and amended text (p24–55) follow.

Standard name
Grid Code
Primary topics
Grid operation and grid code, Technical standards, Scheduling and despatch

Read with this

The regulation

Proposed changes (drafts with no final yet)

Earlier drafts

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document