TNERC · Tamil Nadu Electricity Regulatory Commission
Tamil Nadu Electricity Grid Code, 2025 — Draft
Tamil Nadu Electricity Grid Code, 2025
Draft codeDated 12 May 2025
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft principal State Grid Code issued by TNERC for public comments, signed 12 May 2025, intended to replace the 2005 Tamil Nadu Electricity Grid Code. It would extend to the whole State and bind SLDC, STU/TANTRANSCO, transmission and distribution licensees, generating companies (including State stations, IPPs, CGPs and renewables), storage, open-access users and other users connected at 33 kV and above (p2, p27, p51–52). It takes effect only from the Gazette publication date, which is not printed (p2).
Chapters 1–3 set title, commencement, extent, scope, definitions and general rules; the IEGC prevails over any inconsistency (p2–31). Chapter 4 assigns functions to STU, SLDC, transmission licensees, TNERC, GoTN and the State Power Committee (p31–36). Chapter 5 establishes the Grid Code Review Committee and functional committees—OCC, PCC and TMC—and the compliance/monitoring regime (p36–42). Chapter 6 covers resource adequacy, demand forecasting and transmission planning (p43–50). Chapter 7 sets connectivity conditions, connection-point responsibilities, SLDs, site drawings, technical requirements and commissioning procedures (p50–61).
Chapters 8–10 cover system security, including UFR/df/dt, voltage limits, RE must-run and curtailment; commissioning, trial runs and COD; and operational planning, demand control and load crash management (p61–90). Chapter 11 is the scheduling and despatch code: day-ahead timelines, merit order, revisions, alternate supply and minimum turndown (p90–107). Chapters 12–14 address frequency/voltage management, reserves, monitoring of generation/drawal, and outage planning plus post-despatch event reporting (p107–125). Chapters 15–16 cover contingency/restoration and inter-user boundary safety (p125–134). Chapter 17 sets periodic reports and operational event reporting; Chapter 18 sets protection protocol, settings, audit and testing (p135–147). Chapters 19–21 cover transmission metering, cyber security and data registration (p147–165). Chapter 22 contains relaxations, repeal/savings and contract treatment (p165–166). Appendices A–J supply planning, operational, protection and metering data formats, planning standards, site responsibility, incident reporting, third-party protection audit template and reactive-power compensation principles (p167–201); the Explanatory Statement explains the IEGC 2023 alignment (p202).
Read with this
The regulation
- Dated 19 Oct 2005Tamil Nadu Electricity Grid Code
Amendments and corrections
Proposed changes (drafts with no final yet)
- Dated 22 Mar 2022Tamil Nadu Electricity Grid Code — Draft Amendments, 2022
Earlier drafts
- Dated 16 Aug 2012Tamil Nadu Electricity Grid (Amendment) Code, 2012 — Draft
2 more documents belong here and are not on Voltaic: 2 copies in another language.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.