Draft Approval of Capital Investment Schemes Regulations, 2022 — Explanatory Memorandum

EXPLANATORY MEMORANDUM ON Draft Maharashtra Electricity Regulatory Commission (Approval of Capital Investment Schemes) Regulations, 2022

Explanatory memorandum to a draftReleased with the notice dated 14 Mar 2022

Draft

The draft has since been finalised as the Approval of Capital Investment Schemes Regulations, 2022.

Explanatory memorandum to the Approval of Capital Investment Schemes Regulations, 2022 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is MERC's explanatory memorandum for the draft MERC (Approval of Capital Investment Schemes) Regulations, 2022, published in March 2022. It is not itself the regulation: it explains why MERC proposes to replace the approach of its 2005 Capex Guidelines with a fuller approval framework and reproduces the draft clauses under discussion (p1, p7–10). Chapter 1 sets out the statutory background under ss 61 and 181 of the Electricity Act 2003 and the perceived gaps after 16 years of the Capex Guidelines (p7–10). Chapter 2 explains applicability to existing and future generation, transmission and distribution entities, STU and MSLDC, with new generating unit/station capex kept under the MYT Regulations 2019, and discusses key definitions (p11–15). Chapter 3 is the core categorisation: positive objectives and business-wise indicative lists, a negative list, rules on asset replacement and obsolescence, the treatment of overhead-to-underground conversion, reinstatement charges and capex versus opex schemes (p16–43).

Chapter 4 is the longest part. It explains the revised DPR threshold, continuation of two-stage approval (in-principle then completed cost), exemptions, a value-based approval ladder involving a scrutiny committee and STU for large transmission schemes, half-yearly filing windows, clubbing/splitting rules, the DPR submission format and supporting documents, technology upgradation, revised in-principle approval, completed-cost filing, the rolling five-year capital investment plan and the prudence-check criteria for in-principle and completed cost (p45–127). Chapter 5 deals with time and cost overruns: maximum completion horizons, IDC disallowance linked to delay, and cost-overrun ceilings and treatment (p128–137). Chapter 6 sets post-approval conditions: deemed cancellation for late start, half-yearly reporting, competitive-bidding procurement, sister-concern approval, standard cost sheets, STU's gatekeeping role and a web portal (p138–147). Appendix 1 supplies the DPR and approval formats; Appendix 2 contains competitive-bidding procurement guidelines (p148–165).

Standard name
Capital Investment Approval
Primary topics
Capital cost and investment, Network planning and investment, Competitive bidding

Read with this

The regulation

Commencement notices and reasons

Procedures and orders made under it

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document