A proposal that has since been finalised as the Approval of Capital Investment Schemes Regulations, 2022.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft MERC principal regulation, dated 14 March 2022 (p39), that would govern how Maharashtra's regulated power entities obtain Commission approval for capital investment. It applies to existing and future generation, transmission and distribution businesses/licensees, the STU, MSLDC and successors (p1), but carves out approval of capital cost for new generating units/stations and additional capitalisation within their original scope, which remains under the MERC (Multi-Year Tariff) Regulations, 2019 (p1). It would commence on Gazette publication (p2), though no Gazette date is printed.
Regulation 3 (pp6–14) sets the objectives that make a scheme eligible and gives indicative eligible categories for generation, transmission, distribution and MSLDC, plus a negative list. It constrains asset replacement, distinguishes capex from Opex/O&M, and lays out criteria for overhead-to-underground cable conversion and Mumbai parallel-licence network investment.
Regulation 4 (pp14–17) is the approval architecture. It splits schemes into DPR and Non-DPR schemes by value, with lower thresholds for MSLDC and non-MSEDCL deemed distribution licensees, provides for in-principle approval before investment and final approval of completed cost, routes mid-value schemes through a Capital Investment Scrutiny Committee, and sets presentation and scrutiny paths by value and entity. It also fixes filing windows and bans splitting or unrelated clubbing.
Regulations 5 and 6 (pp17–23) prescribe what an in-principle application and a completed-cost application must contain. Regulations 8–10 (pp24–28) set prudence-check criteria for in-principle approval, completed DPR cost and completed Non-DPR cost, including disallowance or lower return on equity consequences. Regulation 7 (pp23–24) requires five-year rolling capital investment plans; Regulation 18 (pp37–38) gives the STU a central role in transmission planning and validation.
The later regulations deal with implementation controls: Section 63 projects are normally outside the regime but may get final approval in force-majeure/change-in-law disputes (p32); contingency and other overheads are capped or must be justified (p32); delay and cost overruns attract IDC disallowance, ceiling-cost and FERV rules (pp33–35); and capex schemes must meet procurement, sister-concern, reporting, asset-register and completion-report prerequisites (pp35–36). Standard cost sheets and a web portal are mandated (pp36–38). Regulation 11 (pp28–31) creates a bespoke Mumbai parallel-licensee mechanism with scenarios, levels and M-DNAC. Appendices 1 and 2 supply filing/approval formats and competitive-bidding procurement guidelines (pp40–57).
Read with this
The regulation
- Dated 12 Jul 2022Approval of Capital Investment Schemes Regulations, 2022
Commencement notices and reasons
Procedures and orders made under it
Earlier drafts
- Released with the notice dated 14 Mar 2022Explanatory memorandum: Draft Approval of Capital Investment Schemes Regulations, 2022 — Explanatory Memorandum
- Dated 14 Mar 2022Public notice: Draft Approval of Capital Investment Schemes Regulations, 2022 — Public Notice Inviting Comments
- Dated 5 Apr 2022Notice extending the date for comments: Extension of time for comments on Draft Capital Investment Schemes Regulations, 2022 — Public Notice
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.