RERC · Rajasthan Electricity Regulatory Commission
Renewable Energy Sources — Wind and Solar Tariff (Second Amendment) Regulations, 2019
Rajasthan Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff for Renewable Energy Sources-Wind and Solar Energy) (Second Amendment) Regulations, 2019
AmendmentDated 5 Mar 2019Published in the Gazette 15 Mar 2019No.RERC/Secy/Regulation - 128 dated March 05, 2019
Replaced by Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2020
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Second Amendment to RERC's 2014 wind and solar tariff regulations was issued in Jaipur on 5 March 2019 and published in the Rajasthan Gazette Extraordinary on 15 March 2019; it comes into force on gazette notification (p1). Its opening clauses extend the Principal Regulations' control period by a year, change the regulation's numeric span from five to six, and add a proviso keeping existing tariff norms applicable if the next control period's regulations are not notified in time (p1).
The centrepiece is new Regulation 6A, which lets the Commission determine project-specific tariffs case by case for solar PV and solar thermal, onshore and offshore wind, renewable-renewable and renewable-conventional hybrids approved by MNRE, other new MNRE-approved technologies, and projects under central or state government schemes; for recorded reasons the Commission may deviate from the Part III-VI financial and technical norms (p1–2). Consequential amendments to Regulations 7, 9, 11 and 12 set the petition fee and contents, the application of tariff principles, the capital-cost break-up and the treatment of equity above or below 30% for project-specific tariff (p2–3).
Financial norms for generic tariff are revised: loan tenure and the SBI MCLR-linked interest rate, depreciation rates and salvage value, return on equity grossed up by MAT, working-capital interest, and the deletion of one return-on-equity sub-regulation (p3). Dispatch of wind and solar is aligned with the CERC Indian Electricity Grid Code 2010, the Rajasthan Grid Code 2008 and RERC's 2017 forecasting and deviation-settlement regulations (p2). Rebate and late payment surcharge from 1 April 2019 follow the RERC Tariff Regulations 2019 (p3). REC-mechanism project tariffs are moved to the 2010 REC Obligation Compliance Framework (p3–4), and energy accounting and banking are restated, with unutilised banked energy beyond a set share lapsing (p4). Two petition forms are appended (p4–6) and an errata corrects sub-regulation numbering (p13).
Read with this
The regulation
Amendments and corrections