Terms and Conditions for Determination of Tariff for Renewable Energy Sources - Wind and Solar Energy Regulations, 2014

Rajasthan Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff for Renewable Energy Sources - Wind and Solar Energy) Regulations, 2014

RegulationDated 24 Feb 2014In force from 1 Apr 2014RERC/Secy/ Reg. - 106 dated 24th February, 2014

Replaced by Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2020

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Rajasthan Electricity Regulatory Commission's principal tariff regulation for wind and solar generation. Notified in Jaipur on 24 February 2014 as No. RERC/Secy/Reg.-106 (p1), it is made under Sections 61 and 62 read with Sections 86 and 181 of the Electricity Act, 2003, extends to the whole of Rajasthan, and governs generic tariff determination for wind, solar PV and solar thermal plants. It comes into force on 1 April 2014 for a five-year control period running to FY 2018-19, and tariffs for plants commissioned in the control period continue for a 25-year tariff period (p1, p4).

Part I (p1–4) sets commencement, definitions, scope and eligibility — it applies only to new wind turbine generators and to solar plants using MNRE-approved technologies, and the Commission must adopt tariffs already discovered through Section 63 bidding.

Part II (p4–6) covers the control and tariff periods, the petition procedure, the single-part tariff structure built from O&M, depreciation, interest on loan and working capital and return on equity, levelised tariff design using the CERC discount factor, and must-run despatch status.

Part III (p6–9) lays out the financial principles: capital cost, the debt-equity ratio, loan tenure and interest rates benchmarked to the SBI base rate, depreciation, return on equity with tax gross-up, working capital, O&M escalation, rebate and late payment surcharge, sharing of CDM benefits, and treatment of government subsidy and accelerated depreciation.

Parts IV to VI (p9–13) give technology-specific parameters for wind, solar PV and solar thermal — capital cost (with a WPI-based indexation formula for wind), capacity utilisation factor with de-ration, and O&M expenses; solar capital costs are left to separate annual Commission orders.

Part VII (p13–19) deals with legacy tariffs for plants set up under Government of Rajasthan and Government of India policies and under earlier Commission orders, the REC-to-preferential-tariff switch, grid connectivity charges and non-firm injection limits, metering points and loss factors, kVArh, grid import, transmission and wheeling charges, SLDC fees, cross-subsidy surcharge exemption, and banking for captive consumption.

Part VIII (p19) covers deviation, amendment and removal of difficulties; Annexure-1 (p20) lists abbreviations.

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Capital cost and investment

Read with this

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page