TNERC · Tamil Nadu Electricity Regulatory Commission
Tamil Nadu State Power Committee Operating Procedures and Business Rules, 2025
ProcedureDated 21 Jan 2025
Made under the Forecasting, Scheduling and Deviation Settlement for Wind and Solar Generation Regulations, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is the Tamil Nadu State Power Committee Operating Procedures and Business Rules, 2025, approved by TNERC on 21 January 2025 and stated to come into force from 1 August 2024, the date of the Commission proceeding that constituted the committee (pp1, 5). It is prepared by TNSLDC under Regulation 18 of TNERC's 2024 wind/solar forecasting and deviation settlement regulations and Regulation 15 of TNERC's 2019 DSM regulations, and it reproduces relevant extracts from Proceeding No. TNERC/DVSM/1142 dated 01-08-2024, including the committee composition (pp3–4).
After definitions (pp5–6), it sets the TNSPC's functions: coordinating intra-state energy exchange, monitoring state entities' compliance and annual reporting, guiding TNSLDC on procedural modifications, and advising the Commission on regulatory changes (pp6–7). It creates a secretariat headed by a Member Secretary not below Superintending Engineer and assigns duties including meeting organisation, agenda and minutes, DSM accounts, state energy accounts, commercial issue resolution, litigation representation, member facilities, ARR expenditure and sub-committees (pp7–8). It requires TNSLDC and state constituents to supply data (p8).
Sections 7–16 specify meeting procedure: proposals and Commission references, notice periods and emergency notice, agenda circulation and comment timelines, place/date, non-receipt effects, cancellation, quarterly periodicity, consensus decisions with referral to the Commission where consensus fails, presiding arrangements, and recording/confirmation of minutes (pp9–12). Section 17 covers member facilities; Section 18 prescribes weekly/monthly DSM statements and monthly state energy accounting reports; Section 19 preserves inherent powers to depart from the rules in special circumstances subject to placing the action before the Commission (pp12–13).
Read with this
The regulation
Procedures and orders made under it
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.