TNERC · Tamil Nadu Electricity Regulatory Commission
Forecasting, Scheduling and Deviation Settlement for Wind and Solar Generation Regulations, 2023 — Draft
Tamil Nadu Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and related matters for Wind and Solar Generation) Regulations, 2023
Draft regulationDated 11 Sep 2023
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft TNERC regulation, dated 11 September 2023, that would replace the 2019 wind and solar forecasting, scheduling and deviation settlement regulations. The notice on p1 invites objections and suggestions by 10 October 2023 and says the draft will be considered after 30 days from publication on the TNERC website. It is proposed under Electricity Act 2003 ss.86(1) and 181(2)(zp), read with ss.32 and 33, and would take effect from the date of publication in the Tamil Nadu Government Gazette (p2).
The operative text has five parts. Part A (pp6-7) sets the objective of integrating wind and solar generation while maintaining grid security through forecasting, scheduling and deviation settlement, and states the applicability: wind and solar generators connected to the intra-state transmission or distribution system, including pooling substations and self-consumption or sale within or outside the state, excluding rooftop PV solar projects of capacity less than 1 MW. The Commission is to review the regulations, including absolute error, accuracy band and deviation charges, after two years or earlier.
Part B (pp7-15) is the Forecasting and Scheduling Code. It requires generators to appoint a Qualified Co-ordinating Agency (QCA) — a single statewide QCA chosen by majority, a pooling-substation QCA, or the generator itself — with options to use SLDC forecasting services and limited aggregation for small pooling substations. It covers QCA registration, technical data, AMR metering, forecasts and schedules, day-ahead and week-ahead scheduling, revisions, the Detailed Procedure, forecasting charges, gaming penalties and cancellation of registration.
Part C (pp15-18) is commercial: intra-state deviation settlement with separate wind and solar deviation-charge tables based on absolute error bands, a ceiling on total annual deviation charges, exclusions for forced backdown or abnormal weather intimated well in advance, and separate treatment of inter-state transactions under the CERC DSM 2022 framework. Part D (pp19-24) covers implementation — metering, QCA-SLDC communications, deviation accounting, billing and payment security, de-pooling, curtailment intimation and monthly energy accounting. Part E (pp24-25) contains amendment power, repeal and savings of the 2019 regulations, removal of difficulties, relaxation and directions.
The Explanatory Statement (pp26-28) explains the background: the 2019 rules used available capacity and frequency-linked concepts, while CERC replaced its 2014 DSM framework with the 2022 regulations. It also says multiple QCAs are impractical for the SLDC, hence the single-QCA option, and that ceiling rates are to be refixed from an SLDC pilot study. Stakeholder comments were invited on the draft.
Read with this
The regulation
Other copies of these documents (1)
Proposed changes (drafts with no final yet)
2 more documents belong here and are not on Voltaic: 2 copies in another language.