TNERC · Tamil Nadu Electricity Regulatory Commission
Forecasting, Scheduling and Deviation Settlement for Wind and Solar Generation Regulations, 2019
Tamil Nadu Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and related matters for Wind and Solar Generation) Regulations, 2019
Regulation · CopyDated 1 Mar 2019Published in the Gazette 20 Mar 2019No.VI (2)/32/2019 dated 01.03.2019
Replaced by Forecasting, Scheduling and Deviation Settlement for Wind and Solar Generation Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
The copy of the Wind and Solar Forecasting, Scheduling and Deviation Settlement Regulations, 2019.
Summary
Summary written by software, from pages 1 to 20 of 25. Check the regulator's original before you rely on it.
This Gazette notification publishes two principal TNERC regulations together (p1-2, p12). The first is the TNERC (Forecasting, Scheduling and Deviation Settlement and Related Matters for Wind and Solar Generation) Regulations, 2019, notified as No.VI (2)/32/2019. It applies to wind and solar generators other than rooftop PV, connected to Tamil Nadu's intra-State transmission or distribution system, including pooling substations, whether they sell or self-consume inside or outside the State (p4). It creates a Forecasting and Scheduling Code built around Qualified Co-ordinating Agencies (QCAs): appointment and registration with SLDC, day-ahead and week-ahead schedules, one-and-a-half-hourly revisions, telemetry, metering and communication (p4-8). It defines Absolute Error and deviation, sets deviation-charge frameworks for intra-State and inter-State transactions, caps annual deviation charges for wind/solar, and provides de-pooling, payment security through letter of credit, curtailment intimation, weekly energy accounting and monthly billing (p6-10). Fiscal provisions commence six months after the rest (p2); the Commission will review the regulation after two years (p4).
The second is the TNERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2019, notified as No.VI(2)/33/2019. It applies to short-, medium- and long-term open access transactions using the intra-State transmission or distribution system, including inter-State wheeling (p14), and binds Sellers and Buyers as State Entities, while expressly excluding wind/solar generating stations covered by the first regulation and treating full and partial open access consumers separately for certain deviations (p14-15). It imposes SLDC and State Entity duties, monthly energy accounting statements and weekly deviation statements (p14-15). Regulation 7 sets the DSM design parameters - scheduling period, frequency operating range, deviation, settlement period, measurement units, price vector, volume limits and loss allocation (p15-16). Regulations 10 and 11 set frequency-linked deviation charges, caps, zero-charge situations, additional charges for crossing volume limits and failure to change the sign of deviation, and Regulation 9 covers gaming (p16-19). Accounting, State Deviation Pool Account operation and payment timelines are in Regulations 13-14 (p19-20). Wind/solar deviations under the DSM regulation are referred back to the first regulation (p16).
The copy supplied covers pages 1-20 of 25 and ends mid-Regulation 14 of the DSM Regulations. Both regulations were published in the Gazette dated March 20, 2019; the six-month deferral for commercial arrangements/deviation charges and penalty is stated in each (p2, p12-13).
Read with this
The regulation
Proposed changes (drafts with no final yet)
2 more documents belong here and are not on Voltaic: 2 copies in another language.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.