TNERC · Tamil Nadu Electricity Regulatory Commission
Forecasting, Scheduling and Deviation Settlement and Related Matters for Wind and Solar Generation Regulations, 2019 — Draft Amendment
Draft of the amendment to the TNERC (Forecasting, Scheduling and Deviation Settlement and Related Matters for Wind and Solar Generation) Regulations 2019
Draft amendmentDated 18 Nov 2019Draft Notification No.TNERC/F&S Wind & Solar/21-2 dated .11.2019
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a consultation draft, issued by the Tamil Nadu Electricity Regulatory Commission, of a one-clause amendment to the TNERC (Forecasting, Scheduling and Deviation Settlement and Related Matters for Wind and Solar Generation) Regulations, 2019. The notice page states the enabling powers (Electricity Act 2003, s.86(1) and s.181(2)(zp) read with ss.32 and 33), records that the draft is published under s.181(3) for information of affected persons, invites comments by 03.12.2019, and says the draft will be taken up fifteen days after it is placed on the TNERC website, with objections to be sent in duplicate to the Secretary (p1).
The operative clause does one thing: in regulation 1(2) of the 2019 Regulations it substitutes the existing proviso, so that the provisions on Commercial Arrangements and the provisions on Deviation Charges and penalty come into force on a date the Commission notifies instead of on a date fixed by the Regulations themselves (p2). No new date is set; the amendment is purely enabling.
The Explanatory Statement explains why. Under the existing proviso, those commercial and penalty provisions should have come into force six months after the start of the Regulations, i.e. from 21.9.2019. Stakeholders asked for more time to trial the mechanism after installing hardware and software, and the State Load Despatch Centre, TANTRANSCO, asked for extension to finish the pilot run of software modules and installation of equipment. The amendment is therefore presented as a way to notify the effective date once all implementation activities are complete (p3). A comparative statement of the existing and proposed text is set out on p4. Because the instrument is a draft, nothing in it takes effect until the Commission finalises it after the comment period.
Read with this
The regulation
Other copies of these documents (1)
Proposed changes (drafts with no final yet)
2 more documents belong here and are not on Voltaic: 2 copies in another language.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.