TNERC · Tamil Nadu Electricity Regulatory Commission

Forecasting, Scheduling and Deviation Settlement and Related Matters for Wind and Solar Generation Regulations, 2019 — Draft Amendment

Draft of the amendment to the TNERC (Forecasting, Scheduling and Deviation Settlement and Related Matters for Wind and Solar Generation) Regulations 2019

Draft amendmentDated 18 Nov 2019Draft Notification No.TNERC/F&S Wind & Solar/21-2 dated .11.2019

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a consultation draft, issued by the Tamil Nadu Electricity Regulatory Commission, of a one-clause amendment to the TNERC (Forecasting, Scheduling and Deviation Settlement and Related Matters for Wind and Solar Generation) Regulations, 2019. The notice page states the enabling powers (Electricity Act 2003, s.86(1) and s.181(2)(zp) read with ss.32 and 33), records that the draft is published under s.181(3) for information of affected persons, invites comments by 03.12.2019, and says the draft will be taken up fifteen days after it is placed on the TNERC website, with objections to be sent in duplicate to the Secretary (p1).

The operative clause does one thing: in regulation 1(2) of the 2019 Regulations it substitutes the existing proviso, so that the provisions on Commercial Arrangements and the provisions on Deviation Charges and penalty come into force on a date the Commission notifies instead of on a date fixed by the Regulations themselves (p2). No new date is set; the amendment is purely enabling.

The Explanatory Statement explains why. Under the existing proviso, those commercial and penalty provisions should have come into force six months after the start of the Regulations, i.e. from 21.9.2019. Stakeholders asked for more time to trial the mechanism after installing hardware and software, and the State Load Despatch Centre, TANTRANSCO, asked for extension to finish the pilot run of software modules and installation of equipment. The amendment is therefore presented as a way to notify the effective date once all implementation activities are complete (p3). A comparative statement of the existing and proposed text is set out on p4. Because the instrument is a draft, nothing in it takes effect until the Commission finalises it after the comment period.

Standard name
Forecasting, Scheduling and DSM for Wind and Solar
Primary topics
Deviation settlement (DSM)

Read with this

Other copies of these documents (1)

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document