TSERC · Telangana State Electricity Regulatory Commission
Licensee's Duty for Supply of Electricity on Request, 2013 — Second Amendment Regulation, 2026
Telangana Electricity Regulatory Commission (Licensee's Duty for Supply of Electricity on Request) Second Amendment Regulation, 2026
Gazette copyDated 19 Jan 2026Published in the Gazette 19 Jan 2026REGULATION N0. 01 OF 2026 dated JANUARY 19, 2026
A Gazette copy of a regulation Voltaic does not hold or of one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Telangana Gazette of 19 January 2026 (p1) carries the Telangana Electricity Regulatory Commission's Second Amendment to the Licensee's Duty for Supply of Electricity on Request Regulation — Regulation No. 01 of 2026. It amends the erstwhile APERC Regulation No. 4 of 2013, which was adopted for Telangana by Regulation No. 1 of 2014 (10.12.2014) and earlier amended by Regulation No. 1 of 2015 (20.01.2015) (p1–2).
The recitals state the purpose: to simplify and expedite release of LT service connections and additional loads in electrified areas by replacing case-by-case site inspection and estimation with a uniform, objective, load-based service line charge. A public notice was issued on 25.11.2025 and stakeholder suggestions and objections were considered (p2).
Clause 1 gives the short title, extends the regulation to the whole of Telangana and brings it into force from the date of publication in the Telangana Gazette (p2). Clause 2 inserts a proviso under clause 7.1 prescribing Service Line Charges in Rs./kW for new LT connections and additional loads taken through overhead lines, for categories other than LT-VIII (temporary supply and electrification of layouts), where supply is released within 1 km of the electrified network or requires extension of line from the existing distribution mains; it lists the LT categories covered and makes combined contracted load the basis for apartments, commercial complexes and multi-storied buildings (p2–3). Further provisions added after clause 12 make the Distribution Licensee responsible for supplying, erecting and maintaining the distribution transformer at its own cost for these connections, and allow TGDISCOMs to propose revisions to the charges (p4).
Clause 3 substitutes clause 8.3, dealing with dedicated transformers in commercial complexes, apartments and multi-storied buildings: full transformer cost recovery, no development charges, ownership and maintenance by the licensee, and no supply to other consumers from such a transformer. Its provisos draw a 20 kW line — at or below 20 kW both development charges and service line charges apply; above 20 kW only service line charges (p4). Clauses 13 and 14 preserve the Commission's power to issue orders and practice directions and to amend the regulation (p4).
Read with this
Voltaic does not hold the regulation itself.
Amendments and corrections
Earlier drafts
Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.