TSERC · Telangana State Electricity Regulatory Commission
Licensee's Duty for Supply of Electricity on Request Regulation, 2013 — Second Amendment, 2026
Telangana Electricity Regulatory Commission (Licensee's Duty for Supply of Electricity on Request) Second Amendment Regulation, 2026
AmendmentDated 17 Jan 2026REGULATION NO. 01 OF 2026 dated 17.01.2026
Amends a regulation Voltaic does not hold.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Telangana Electricity Regulatory Commission's Second Amendment Regulation, 2026 (Regulation No. 01 of 2026) amends the *Licensee's Duty for Supply of Electricity on Request* Regulation, No. 4 of 2013, the erstwhile APERC regulation that continues to apply in Telangana (p1–2). It takes effect from the date of publication in the Telangana Gazette, which is not printed; the order itself is dated 17.01.2026 (p2, p5).
The core change is a new proviso to clause 7.1 (p2–4). For new LT connections and additional loads taken through overhead lines — excluding LT-VIII temporary supply and electrification of layouts — within 1 km of the electrified network, distribution licensees must collect load-based Service Line Charges per kW of contracted load instead of case-by-case site estimation. Charges are set out in category tables for LT-I domestic, LT-II non-domestic/commercial together with LT-VI street lights/PWS and LT-VII general, LT-III industries, LT-IV cottage industries, LT-V agriculture and LT-IX EV charging stations, applying until the Commission revises them. For apartments, commercial complexes and multi-storey buildings the combined contracted load is used. A second proviso makes the licensee responsible for supplying, erecting and maintaining the distribution transformer at its own cost for these connections, and lets TGDISCOMs file revision proposals.
Clause 3 replaces clause 8.3 (p4): where a dedicated transformer is provided for commercial complexes, apartments and multi-storey buildings outside the new proviso, the licensee recovers the full transformer cost, may not levy development charges, and may not serve any other consumer from that transformer. Where connections fall under the new proviso, development charges plus service line charges apply up to 20 kW of individual or combined load, and only service line charges above that.
Clause 4 inserts clauses 13 and 14, giving the Commission power to issue orders and practice directions and to amend, vary or repeal the regulation (p4–5).
Read with this
Voltaic does not hold the regulation itself.
Amendments and corrections
Other copies of these documents (1)
Earlier drafts
Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.