Licensee's Duty for Supply of Electricity on Request, 2013 — Second Amendment, 2025 — Draft
Telangana Electricity Regulatory Commission (Licensee's Duty for Supply of Electricity on Request) Second Amendment Regulation, 2025
Draft amendmentDated 25 Nov 2025
Draft
A proposal that has since been finalised as the Licensee's Duty for Supply of Electricity on Request Regulation, 2013 — Second Amendment, 2026.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft second amendment to the Telangana (originally APERC) Licensee's Duty for Supply of Electricity on Request Regulation No.4 of 2013. Issued on 25.11.2025, it replaces a previous draft amendment of 17.10.2024 and is open for fresh stakeholder comments (p1–2).
The core is clause 2, which inserts a proviso to clause 7.1 of the principal regulation. It prescribes service line charges (Rs./kW) for new LT connections and additional loads through overhead lines, other than LT-VIII (Temporary supply and Electrification of Layouts), excluding terminal and metering costs. It applies where the connection is within 1 km of the electrified network and/or requires a line extension from existing distribution mains. Charges are slabbed by load for LT-I Domestic, LT-II Non-Domestic/Commercial, LT-VI Street Lights/PWS, LT-VII General, LT-III Industries, LT-IV Cottage Industries, LT-V Agriculture and LT-IX EV Charging Stations (p2–3). For apartments, commercial complexes and multi-storied buildings, combined contracted load is used. The distribution licensee must supply, erect and maintain the distribution transformer at no cost to the consumer, and the rates apply until revised (p3–4).
Clause 3 adds a proviso to clause 8.3: for contracted load up to 20 kW (individual or combined for apartments etc.), both development charges under Annexure-I of the principal regulation and service line charges apply; above 20 kW, only service line charges apply and no development charges (p4).
Clause 4 inserts new clauses 13 and 14 after clause 12, allowing the Commission to issue orders and practice directions and to amend the regulation (p4). The regulation extends to Telangana and comes into force on Gazette publication, date not printed (p2).
Read with this
Voltaic does not hold the regulation itself.
Amendments and corrections
Other copies of these documents (1)
Earlier drafts
- Dated 25 Nov 2025Public notice: Licensees' Duty for Supply of Electricity on Request Regulation, 2013 — Second Amendment, 2025 — Public Notice — Draft
Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.