Licensee's Duty for Supply of Electricity on Request, 2013 — Second Amendment, 2025 — Draft

Telangana Electricity Regulatory Commission (Licensee's Duty for Supply of Electricity on Request) Second Amendment Regulation, 2025

Draft amendmentDated 25 Nov 2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tgerc.telangana.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft second amendment to the Telangana (originally APERC) Licensee's Duty for Supply of Electricity on Request Regulation No.4 of 2013. Issued on 25.11.2025, it replaces a previous draft amendment of 17.10.2024 and is open for fresh stakeholder comments (p1–2).

The core is clause 2, which inserts a proviso to clause 7.1 of the principal regulation. It prescribes service line charges (Rs./kW) for new LT connections and additional loads through overhead lines, other than LT-VIII (Temporary supply and Electrification of Layouts), excluding terminal and metering costs. It applies where the connection is within 1 km of the electrified network and/or requires a line extension from existing distribution mains. Charges are slabbed by load for LT-I Domestic, LT-II Non-Domestic/Commercial, LT-VI Street Lights/PWS, LT-VII General, LT-III Industries, LT-IV Cottage Industries, LT-V Agriculture and LT-IX EV Charging Stations (p2–3). For apartments, commercial complexes and multi-storied buildings, combined contracted load is used. The distribution licensee must supply, erect and maintain the distribution transformer at no cost to the consumer, and the rates apply until revised (p3–4).

Clause 3 adds a proviso to clause 8.3: for contracted load up to 20 kW (individual or combined for apartments etc.), both development charges under Annexure-I of the principal regulation and service line charges apply; above 20 kW, only service line charges apply and no development charges (p4).

Clause 4 inserts new clauses 13 and 14 after clause 12, allowing the Commission to issue orders and practice directions and to amend the regulation (p4). The regulation extends to Telangana and comes into force on Gazette publication, date not printed (p2).

Standard name
Duty to Supply on Request
Primary topics
Connection and miscellaneous charges

Read with this

Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tgerc.telangana.gov.in ↗

Report an issue with this document