Licensee's Duty for Supply of Electricity on Request Regulation, 2013 — First Amendment, 2015
Telangana State Electricity Regulatory Commission (First Amendment to Regulation 4 of 2013, Licensee's duty for supply of electricity on request of APERC) Regulation, 2015
AmendmentDated 19 Jan 2015Published in the Gazette 20 Jan 2015Regulation No.1 of 2015 dated 19/01/2015
Amends a regulation Voltaic does not hold.
Summary
Summary written by software. Check the regulator's original before you rely on it.
A two-page TSERC regulation that amends the APERC regulation governing a distribution licensee's duty to give supply on request. Page 1 explains how it arose: the erstwhile APERC had issued a discussion note on open access and metering issues and concluded that its Regulation No. 4 of 2013 needed changes; TSERC then circulated a draft amendment for stakeholder comment and, after considering the responses, makes the amendments set out here (p1). It also records that erstwhile APERC regulations apply to Telangana through TSERC's Adoption Regulation No. 1 of 2014 (p1).
The operative text is short and sits on page 2. Clause 1 gives the short title and provides that the amendment comes into force from the date of publication in the Telangana Gazette — the Gazette carrying it is dated 20 January 2015 (p1–2). Clause 2 makes three drafting changes to Regulation No. 4 of 2013: it deletes clause 2(f); substitutes a new clause 7(2) dealing with who provides and who pays for the consumer's meter; and deletes clause 7(3) (p2).
The substituted clause 7(2) is the substance of the document. It places the duty of providing an electricity meter on every distribution licensee, allows either the licensee or the consumer to bear the cost of the meter and allied equipment, and, where the consumer elects to buy the meter, requires the licensee to permit it, to accept a meter meeting its own specifications, to test it at its own cost and to install it. Where the licensee bears the cost it may collect meter rent at charges approved by the Commission under section 45 of the Act; where it instead requires the consumer to bear the full cost, no meter rent is chargeable (p2).
Read with this
Voltaic does not hold the regulation itself.
Amendments and corrections
Other copies of these documents (1)
Earlier drafts
Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.