Licensee's Duty for Supply of Electricity on Request — Third Amendment, 2026

Telangana Electricity Regulatory Commission (Licensee's Duty for Supply of Electricity on Request) third amendment Regulation, 2026

Amendment · Gazette copyDated 29 Sep 2026Published in the Gazette 1 Oct 2026Regulation No. 07 of 2026 dated 29.09.2026

The Gazette copy of the Licensee's Duty for Supply of Electricity on Request Regulation, 2013 — Third Amendment, 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tgerc.telangana.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a four-page amendment regulation of the Telangana Electricity Regulatory Commission, published in the Telangana Gazette of 1 October 2026 and signed by order of the Commission on 29 September 2026, adding a further proviso to clause 7.1 of the Licensee's Duty for Supply of Electricity on Request Regulation (p1, p4).

The preamble (pp1–3) traces the lineage of the Principal Regulation — APERC Regulation No. 4 of 2013 of 29 July 2013, made under Sections 43 and 46 of the Electricity Act 2003, carried into Telangana by the adoption Regulation No. 1 of 2014 — and its two earlier amendments of 20 January 2015 and 19 January 2026, the second having introduced uniform, objective, load-based service line charges for LT connections. It records the DISCOMs' request to extend that approach to HT connections, a draft third amendment circulated on 19 February 2026 with comments due by 12 March 2026 (four suggestions received), and the Commission's decision to confine the uniform charge for now to 11 kV overhead extensions of up to 1 km from the existing 11 kV network (pp2–3).

Clause 1 gives the short title, extends the regulation to the whole of Telangana and brings it into force from Gazette publication (p3). Clause 2 inserts the new proviso: for new HT connections or additional load at 11 kV taken over an overhead common feeder within 1 km route length, the distribution licensee collects Rs. 4,078/kVA of contracted demand, excluding the cost of terminal and metering arrangements, until further revision by the Commission (p3). Development charges under Annexure-I of the Principal Regulation remain leviable, and clauses 6.3 and 6.4 of the Principal Regulation are disapplied for the connections covered by this amendment and by the second amendment (p3–4). Extensions beyond 1 km, 33 kV connections and underground cables are left to site-specific estimation, with the Commission to revisit later; the DISCOMs may file revision proposals (pp2, 4).

Standard name
Duty to Supply on Request
Primary topics
Connection and miscellaneous charges

Read with this

Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tgerc.telangana.gov.in ↗

Report an issue with this document