Skip to content

TSERC · Telangana State Electricity Regulatory Commission

Licensee's Duty for Supply of Electricity on Request Regulation, 2013 — Third Amendment, 2026

Telangana Electricity Regulatory Commission (Licensee's Duty for Supply of Electricity on Request) third amendment Regulation, 2026

AmendmentDated 29 Sep 2026TGERC/Secy/D.No. 698/2026 dated 29.09.2026

Amends a regulation Voltaic does not hold.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tgerc.telangana.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the third amendment to the erstwhile APERC "Licensee's Duty for Supply of Electricity on Request" Regulation No. 4 of 2013, which the preamble explains continues to apply in Telangana through TGERC Regulation No. 1 of 2014 pending alteration, repeal or amendment (p1–2). The Commission narrates the chain of prior changes — Regulation No. 4 of 2013, the adoption regulation of 2014, the First Amendment of 2015, and the Second Amendment of 2026 that introduced uniform, objective, load-based service line charges for LT connections to avoid site inspections and case-by-case estimation (p1–2).

On the representation of the TGDISCOMs, the Commission issued a draft third amendment on 19.02.2026 seeking comments by 12.03.2026 and received four stakeholder suggestions (p2). It now extends the same uniform, load-based approach to HT service connections, but deliberately only in a narrow case: 11 kV overhead service lines through common feeders for extensions up to 1 km from the existing 11 kV electrified network (p2–3). Clause 1 gives the short title, Telangana-wide extent and commencement on Gazette publication (p3). Clause 2 inserts a further proviso after the Second Amendment's proviso to clause 7.1, requiring the distribution licensee to collect service line charges in Rs./kVA on contracted demand, excluding terminal and metering costs, plus development charges as per Annexure-I of the Principal Regulation (p3). Two further provisos disapply clauses 6.3 and 6.4 of the Principal Regulation for connections covered by this amendment and by Regulation No. 01 of 2026, and allow the TGDISCOMs to file revision proposals from time to time (p4). Extensions beyond 1 km, 33 kV works and underground cables are left to site-specific treatment, with uniform charges for those categories to be considered later (p2). Complete only on Gazette publication (p4).

Standard name
Duty to Supply on Request
Primary topics
Connection and miscellaneous charges, New connections and load changes

Read with this

Voltaic does not hold the regulation itself.

Other copies of these documents (1)

Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tgerc.telangana.gov.in ↗

Report an issue with this document