Licensee's Duty for Supply of Electricity on Request Regulation, 2013 — Third Amendment, 2026 — Draft

TELANGANA ELECTRICITY REGULATORY COMMISSION (LICENSEE'S DUTY FOR SUPPLY OF ELECTRICITY ON REQUEST) DRAFT THIRD AMENDMENT REGULATION, 2026

Public notice on a draftDated 19 Feb 2026

Public notice on the Licensee's Duty for Supply of Electricity on Request — Third Amendment, 2026 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tgerc.telangana.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a TGERC public notice opening stakeholder consultation on a draft Third Amendment to the Commission's (Licensee's Duty for Supply of Electricity on Request) Regulation No. 04 of 2013 (p1).

It first recites the background: to simplify and speed up release of LT service connections and additional loads in electrified areas, the Commission had notified the Second Amendment (Regulation No. 01 of 2026) on 19.01.2026, introducing uniform, objective, load-based service line charges that avoid individual site inspections and case-by-case estimation (p1). The Telangana DISCOMs have now asked for the same treatment to be extended to HT service connections at 11 kV and 33 kV (p1).

The Commission states it considers this appropriate, and expressly reserves the right to add to or amend the draft — including increasing or decreasing the proposed HT service line charges — after considering stakeholder and licensee suggestions (p1).

The draft is hosted on the Commission's website, and comments, in the prescribed format, must reach the Commission Secretary by 5:00 PM on 12.03.2026, in writing or by email (p2). The notice is dated Hyderabad, 19.02.2026 (p2).

Standard name
Duty to Supply on Request
Primary topics
Connection and miscellaneous charges, New connections and load changes

Read with this

Voltaic does not hold the regulation itself.

Other copies of these documents (1)

Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tgerc.telangana.gov.in ↗

Report an issue with this document