Skip to content

TSERC · Telangana State Electricity Regulatory Commission

Licensee's Duty for Supply of Electricity on Request — Third Amendment, 2026 — Draft

Telangana Electricity Regulatory Commission (Licensee's Duty for Supply of Electricity on Request) Third Amendment Regulation, 2026

Draft amendmentDated 19 Feb 2026

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tgerc.telangana.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft third amendment to the Telangana (originally APERC) "Licensee's Duty for Supply of Electricity on Request" Regulation No. 4 of 2013, published for stakeholder consultation by the Telangana Electricity Regulatory Commission and signed by its Secretary on 19.02.2026 (p1, p3). The preamble traces the instrument's lineage: the Principal Regulation notified 29.07.2013, its adoption for Telangana by Regulation No. 1 of 2014 on 10.12.2014, the First Amendment (Regulation No. 1 of 2015, 20.01.2015), and the Second Amendment (Regulation No. 1 of 2026, 19.01.2026), which introduced uniform, load-based service line charges for LT connections to avoid site inspections and case-by-case estimation (p1).

The amendment responds to TGDISCOMs' request to extend that approach to HT service connections and additional loads at 11 kV and 33 kV (p2). Clause 1 gives the short title, extent and commencement on Gazette publication (p2). Clause 2 inserts a further proviso under clause 7.1 requiring the distribution licensee to collect Service Line Charges in Rs./kVA on the contracted demand for new HT connections or additional HT load — through overhead lines, underground cables, a common feeder within 20 KM radius of the electrified network, or where the release requires line extension — excluding terminal and metering costs, until further revision (p2-3).

Further provisos apportion SLC proportionately where overhead and underground sections are combined, preserve development charges under Annexure-I of the Principal Regulation, disapply clauses 6.3 and 6.4 for these connections and those covered by Regulation No. 1 of 2026, and allow the DISCOMs to propose SLC revisions (p3). The Commission reserves the right to alter the draft provisions or the proposed charges.

Standard name
Duty to Supply on Request
Primary topics
Connection and miscellaneous charges, New connections and load changes

Read with this

Voltaic does not hold the regulation itself.

Other copies of these documents (1)

Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tgerc.telangana.gov.in ↗

Report an issue with this document