HERC · Haryana Electricity Regulatory Commission
Renewable Energy Tariff, RPO and REC Regulations, 2017 — 2nd Amendment, 2019
Haryana Electricity Regulatory Commission (Terms and Conditions for determination of Tariff from Renewable Energy Sources, Renewable Purchase Obligation and Renewable Energy Certificate) Regulations (2nd Amendment), 2017
AmendmentDated 14 Jun 2019HERC/40/2018/2nd Amendment/2019 dated 14th June, 2019
Replaced by RE Tariff, RPO and REC Regulations, 2021
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the second amendment to HERC's 2017 regulations on renewable energy tariffs, renewable purchase obligation (RPO) and renewable energy certificates. It is issued as Regulation No. HERC/40/2018/2nd Amendment/2019, notified on 14 June 2019, extends to the whole of Haryana, and takes effect from the date of notification in the Haryana Government Gazette (p1). It replaces or clarifies six provisions of the parent regulation, and several of its RPO changes reach back to FY 2016-17.
Section 2 replaces Regulation 54 on RPO (p1–2). It restates who is obligated — distribution licensees, captive consumers and open access consumers including short-term — and sets a year-wise RPO trajectory running from FY 2016-17 to FY 2021-22, split into solar and non-solar components with a parallel column excluding hydro-solar. Fossil-fuel captive plants of 5 MW and above get their RPO pegged to the year of commissioning, with plants commissioned up to 2018-19 pegged at FY 2018-19, and additions to capacity triggering fresh obligation. It also preserves purchases under Commission-approved PPAs that exceed RPO, directs DISCOMs to weigh RECs against RE power purchase, and leaves solar/non-solar interchangeability to a central-level decision.
Section 3 replaces Regulation 58 on banking of RE power (p2–3): banking charges taken in kind, month-to-month carry-forward with year-end lapse and a solar exception, a bar on drawal during peak months and peak-load hours, a monthly banked-energy formula, scheduling and deviation to follow a separate regulation still being finalised, and a priority order for settling wheeled energy at the consumer end.
Sections 4 and 5 deal with evacuation and charges: Regulation 59 is clarified on who bears EHV/HV line cost up to 10 km and beyond, and Regulation 60 is replaced with a life-of-project wheeling and transmission charge exemption for eligible captive solar projects, no waivers for IPP third-party sale, and RPO benefit to utilities in lieu (p3–4).
Section 6 clarifies Regulation 64 on rooftop solar — installation irrespective of sanctioned load, sale to HPPC at the least discovered solar price, no net metering, a 15-day connectivity deadline — and adds a canal/reservoir feasibility certificate requirement and a per-unit incentive for solar with battery storage, smart meters and smart grid (p4–5).
Read with this
The regulation
Amendments and corrections
Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.