HERC · Haryana Electricity Regulatory Commission

RE Tariff, RPO and REC Regulations, 2021

Haryana Electricity Regulatory Commission (Terms and Conditions for determination of Tariff from Renewable Energy Sources, Renewable Purchase Obligation and Renewable Energy Certificate) Regulations, 2021

RegulationDated 30 Apr 2021Regulation No. HERC/53/2021 dated The 30th April, 2021

Replaced by Renewable Energy Tariff, RPO and REC Regulations, 2025

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on herc.org.in ↗

Summary

Summary written by software, from pages 1 to 40 of 56. Check the regulator's original before you rely on it.

This is the Haryana Electricity Regulatory Commission's 2021 principal regulation for renewable energy tariffs, renewable purchase obligations (RPO) and renewable energy certificates (RECs), notified as Regulation No. HERC/53/2021 on 30 April 2021 (p1). It is made under s.181 of the Electricity Act 2003, comes into force on Gazette publication (Gazette date not printed) and extends to grid-connected RE projects and obligated entities in Haryana (p1).

Chapter 1 (pp1–9) defines core terms and eligibility criteria. Eligibility is technology-specific: for example, wind sites must meet a wind power density threshold, small hydro must be ≤25 MW at a single location, and most technologies must use new plant and machinery (pp7–9). Obligated entities are distribution licensees, open-access consumers including short-term consumers, and fossil-fuel-based captive/co-generation plants of 5 MW and above (p4).

Chapter 2 (pp10–14) sets the control period (FY2021-22 to FY2024-25), tariff period, project-specific tariff categories, petition requirements, tariff structure/design and dispatch principles. Generic tariff is normally determined on a suo motu petition at least six months before each control-period year; project-specific tariff can be sought for listed technologies (pp10–12). All RE plants are must-run except biomass ≥10 MW, with solar/wind scheduling routed to HERC's 2019 forecasting and DSM regulations (p14).

The financial principles chapter (pp15–21) lays down common norms for capital cost, debt-equity, loan tenure and interest, depreciation, return on equity, working capital, O&M escalation, rebate, late payment surcharge, CDM/other income sharing, subsidy treatment and tax pass-through. These norms act as ceilings for project-specific tariff (p11).

Technology chapters (pp22–35) provide parameter tables and text for wind, small hydro, biomass, bagasse/non-fossil cogeneration, solar PV/thermal, biomass gasifier, biogas, processed municipal solid waste (WtE), renewable hybrid and RE-with-storage projects. Solar is project-specific only, with no generic tariff; hybrid and storage projects are also project-specific (pp30, 34–35).

The final chapter (pp36–40) deals with RPO and RECs. It sets a year-wise RPO trajectory with solar, non-solar and hydropower purchase obligation (HPO) components, computation and cross-category compliance rules, and confirms CERC RECs and Hydro Energy Certificates as compliance instruments. HAREDA is designated the State Agency, and RPO default can trigger a shortfall fund deposit, licence breach and penalty (pp36–40).

Standard name
Renewable Energy Tariff Regulations, RPO Regulations, REC Regulations
Primary topics
Renewable energy tariff, Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC)

Read with this

Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.