Skip to content

HERC · Haryana Electricity Regulatory Commission

Terms and Conditions for determination of Tariff from Renewable Energy Sources, RPO and REC Regulations, 2017

Haryana Electricity Regulatory Commission (Terms and Conditions for determination of Tariff from Renewable Energy Sources, Renewable Purchase Obligation and Renewable Energy Certificate) Regulations, 2017

RegulationDated 24 Jul 2018HERC/ 40 / 2018 dated The 24th July, 2018

Replaced by RE Tariff, RPO and REC Regulations, 2021

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on herc.org.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This notification (p1) makes the HERC (Terms and Conditions for determination of Tariff from Renewable Energy Sources, Renewable Purchase Obligation and Renewable Energy Certificate) Regulations, 2017, issued 24 July 2018 as Regulation No. HERC/40/2018 under section 181 of the Electricity Act 2003. They apply to all grid-connected renewable energy projects and obligated entities in Haryana (p1). Chapter 1 (p1–7) defines terms and lists eligibility criteria for each technology. Chapters on Norms (p8–12) set the Control Period at FY 2017-18 to FY 2020-21, provide for tariff and review periods, project-specific tariff routes, petition requirements, and a single-part tariff structure (with a two-part structure for fuel-based technologies). Financial Principles (p13–17) cover capital cost, debt-equity, loan interest, depreciation, return on equity, working capital, O&M escalation, rebates, late payment surcharge, CDM benefit sharing, subsidy adjustment and tax pass-through. Technology-specific chapters (p18–29) give parameters for wind, small hydro, biomass (Rankine cycle), non-fossil fuel cogeneration, solar PV, biomass gasifier, biogas and municipal solid waste-to-energy. Chapter 12 (p30–37) sets renewable purchase obligation targets by year, treats CERC RECs as compliance instruments, designates HAREDA as State Agency, specifies default consequences, banking rules, evacuation cost sharing, and waivers of wheeling, cross-subsidy, transmission and distribution charges for solar open access. Miscellaneous (p38–39) covers deviation from norms, power to relax, amend, remove difficulties and savings.

Standard name
Renewable Energy Tariff Regulations, RPO Regulations, REC Regulations
Primary topics
Renewable energy tariff, Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC)

Read with this

Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on herc.org.in ↗

Report an issue with this document