HERC · Haryana Electricity Regulatory Commission
Terms and Conditions for determination of Tariff from Renewable Energy Sources, RPO and REC Regulations, 2017
Haryana Electricity Regulatory Commission (Terms and Conditions for determination of Tariff from Renewable Energy Sources, Renewable Purchase Obligation and Renewable Energy Certificate) Regulations, 2017
RegulationDated 24 Jul 2018HERC/ 40 / 2018 dated The 24th July, 2018
Replaced by RE Tariff, RPO and REC Regulations, 2021
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This notification (p1) makes the HERC (Terms and Conditions for determination of Tariff from Renewable Energy Sources, Renewable Purchase Obligation and Renewable Energy Certificate) Regulations, 2017, issued 24 July 2018 as Regulation No. HERC/40/2018 under section 181 of the Electricity Act 2003. They apply to all grid-connected renewable energy projects and obligated entities in Haryana (p1). Chapter 1 (p1–7) defines terms and lists eligibility criteria for each technology. Chapters on Norms (p8–12) set the Control Period at FY 2017-18 to FY 2020-21, provide for tariff and review periods, project-specific tariff routes, petition requirements, and a single-part tariff structure (with a two-part structure for fuel-based technologies). Financial Principles (p13–17) cover capital cost, debt-equity, loan interest, depreciation, return on equity, working capital, O&M escalation, rebates, late payment surcharge, CDM benefit sharing, subsidy adjustment and tax pass-through. Technology-specific chapters (p18–29) give parameters for wind, small hydro, biomass (Rankine cycle), non-fossil fuel cogeneration, solar PV, biomass gasifier, biogas and municipal solid waste-to-energy. Chapter 12 (p30–37) sets renewable purchase obligation targets by year, treats CERC RECs as compliance instruments, designates HAREDA as State Agency, specifies default consequences, banking rules, evacuation cost sharing, and waivers of wheeling, cross-subsidy, transmission and distribution charges for solar open access. Miscellaneous (p38–39) covers deviation from norms, power to relax, amend, remove difficulties and savings.
Read with this
Amendments and corrections
Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.