Summary written by software. Check the regulator's original before you rely on it.
This is a short, four-clause amendment by the Haryana Electricity Regulatory Commission to its 2017 regulations on renewable energy tariffs, renewable purchase obligation and renewable energy certificates. It is notified as Regulation No. HERC/40/2018/1st Amendment/2018, dated 27 August 2018, extends to the whole of Haryana, and comes into force on the date of notification in the Haryana Government Gazette — a date the text does not print (p1). The amendment is expressly partial.
Clause 2 substitutes Regulation 30, which governs capital cost, and sets out capital cost for biomass power projects differentiated by fuel — rice straw/stubble versus other fuels — and by cooling technology, water-cooled versus air-cooled condensers (p1–2). Clause 3 inserts a clarification after Regulation 60(2): it explains that the 500 MW cap is the aggregate installed capacity of solar PV projects commissioned in Haryana for consumption within Haryana that avail the waivers and concessions under these regulations; it lists what HVPNL weighs when granting connectivity (feasibility, date of project registration, financial closure); it makes HAREDA the nodal agency to monitor project milestones — installed capacity and location, capacity tied up for Haryana consumption, land acquisition, connectivity for open access, financial closure and commissioning date — through a website interface to be developed within two months; and it requires every developer wanting waivers to register the specific project with HAREDA before connectivity is granted (p2–3).
Clause 4 replaces the first paragraph of Regulation 58 on banking of RE power, allowing a generator, captive producer or consumer in the State to bank power on paying banking charges plus transmission and distribution technical losses, under a banking agreement with the concerned Discom (p3).
Read with this
The regulation
Amendments and corrections
Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.