This is a consolidated working text of the Andhra Pradesh Electricity Regulatory Commission (Electricity Supply Code) Regulation, 2004 (Regulation No. 5 of 2004), with the four amendments made to it merged into the body up to the Fourth Amendment, Regulation No. 2 of 2025 dated 25-02-2025 (p1). It is the State's supply code under section 50 of the Electricity Act 2003, addressed to every distribution licensee in its licensed area in Andhra Pradesh; under clause 1.3 it comes into force three months after publication in the Andhra Pradesh Gazette, a date this text does not print (p2).
Clause 2 defines the working vocabulary — consumption charges, HT and LT consumers (supplied above and up to 440 volts respectively), month and premises — and defers other terms to the 2003 Act (p3). Clause 3 governs recovery of charges: tariffs as determined by the Commission, the ceiling arrangement where more than one licensee serves the same area, one point of supply per establishment, pro-rata treatment of new connections starting mid-period, and the e-wallet mechanism for prepaid and smart metering (pp3–5).
Clause 4 is the bulk of the code. It sets billing intervals by consumer category, the information a bill must carry and how bills are delivered, special readings on change of occupancy or vacancy, payment channels and receipts, additional charges for belated payment, the order in which payments are applied, instalment facilities for arrears, and disputed bills (pp5–13). Clause 4.8 covers disconnection — notice requirements and the cases where a printed disconnection date removes the need for separate notice — with the 2025 additions on e-wallet balances, emergency credit, advance alerts, the disconnection window and permanent disconnection (pp13–15). Clause 5 fixes restoration timelines, clause 6 the licensee's right of entry, and clauses 7 and 7A theft, unauthorised use, tampering and damage, cross-referring to sections 126, 127 and 135 (pp15–17). Clauses 8 to 13 deal with service of notice, meter cards and pass books, interpretation, savings, and the Commission's powers to remove difficulties and to amend (pp17–19).
Read with this
The regulation
- Dated 17 Mar 2004Electricity Supply Code Regulation, 2004
Amendments and corrections
- Dated 5 Aug 2013Electricity Supply Code, 2004 — Second Amendment, 2013
- Dated 13 Feb 2019Third Amendment to the Electricity Supply Code, 2019
- Date not statedElectricity Supply Code (First Amendment) Regulation, 2006
Commencement notices and reasons
Proposed changes (drafts with no final yet)
- Dated 1 Jan 2025Electricity Supply Code, 2004 — Fourth Amendment, 2025
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.